Laserfiche WebLink
2026 thru 2035 <br />E. <br />4-' <br />a) <br />E <br />a) <br />0 <br />�z <br />E 2 <br />RI CD <br />i�f E <br />t.) CC <br />14-WTR-002 <br />Refurbish Water Tower #1 <br />Project Name <br />0 <br />c <br />E <br />c_i <br />0 <br />0 <br />0 <br />Total Project Cost <br />Water Utility Improvement <br />Improvement <br />cu <br />u <br />3-Existing Obligation (Med) <br />0 <br />w .o <br />47. <br />•J Q- <br />i <br />v <br />ai O vvi N <br />1-a 0 CI <br />In 2026 clean interior and exterior of water tower #1. <br />0 <br />0 <br />4J <br />Ongoing maintenance of interior and exterior coatings on 0.5mg water tower to include inspections. Project will be scheduled after full inspection of tower. <br />+� O 0 4 O O <br />n O O n <br />N N N N <br />Lfl O O Lfl O O <br />M M <br />O O <br />N N <br />0 0 cr 0 0 <br />M M <br />0 0 <br />N N <br />M O O m O O <br />M M <br />0 0 <br />N N <br />N O 0 N o 0 <br />M M <br />0 0 <br />o 0 c- co 0 <br />M M <br />0 0 <br />N N <br />O O o O o 0 <br />M M <br />O O <br />NO o N O O <br />0 0 <br />N N <br />op o 0 00 0 0 <br />oO 0 0 O o <br />N o 0 N o 0 <br />in in ul in <br />n O 0 N O <br />N N <br />0 0 <br />N N <br />tO o 0 1/40 O 0 <br />0 O 0 0 O 0 <br />N ON 0 N ON 0 <br />Expenditures <br />Improvements Other than Building Cost <br />R R <br />0 0 <br />H H <br />Funding Sources <br />Water Utility Fund <br />Produced Using Plan -It CIP Software <br />