My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/14/2025
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2025
>
Agenda - Parks and Recreation Commission - 08/14/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2025 3:10:58 PM
Creation date
11/17/2025 12:37:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/14/2025
Supplemental fields
Year
%(Da
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 2. <br />Park and Recreation Commission <br />Meeting Date: 08/14/2025 <br />Primary Strategic Plan Initiative: Connect the community through Parks, Trails and Recreational Programming. <br />Information <br />Title: <br />Water Play Development at The Waterfront - Progress Report <br />Purpose/Background: <br />As part of the city's community park system planning, a water -centric park known as The Waterfront has been <br />envisioned for more than a decade in Ramsey's downtown. In 2023, the mass grading for the 16-acre park was <br />completed as part of the preparation of pad -ready development of the entire northwest quadrant of The COR. In <br />2024, the surrounding streets were constructed together with parking for the build -out of the park. Also last Fall, <br />basic landscaping was completed, with a trail that circumnavigates the 7-acre deep -water pond, andconnects the <br />park to the adjoining residential areas and greater community. <br />Earlier this year, City Council developed its 2025 Strategic Plan that included a high-level work plan for <br />The Waterfront. In June, the Park & Recreation Commission recommended, and the Council approved <br />engaging Damon Farber to facilitate the development of a plan and process to meet the goal of having <br />the water -play park improvements completed and open to the public in July 2026. This planning <br />process is proceeding programmatically and with the full attention of staff and consultants needed to <br />meet the aforementioned goal. <br />When City Council authorized the plan and process leading to Spring construction of the water play and <br />associated park improvements, the 'solution' to providing restrooms was not known with certainty, but <br />the option of utilizing prefab restrooms was understood to be likely. At present, the planning team is <br />nearing the completion of the Schematic Design phase and has identified a site plan that works very <br />well for the location of the restrooms, which will also house all the mechanicals (sewer, water, water <br />play distribution and control equipment), together with maintenance storage for the completed park <br />improvement project. <br />One anticipated factor relating specifically to the prefab building was the approximate 7-month <br />production and delivery timeline. In order to have the building on site +/- April for prime contractor <br />assembly and to begin incorporating electrical equipment and mechanical and other site improvements, <br />the city would need to order the building this month or no later than September 2025. Thus, the <br />purpose of this case is to acknowledge the requirement of this pre -bid order, and also to receive a <br />general progress report on this meaningful and significant project that will have so many benefits for the <br />community. <br />Time Frame/Observations/Alternatives: <br />As indicated, for the meeting, staff will present broader background information on The Waterfront park plans, <br />and additional detail on the scope and schedule of the fasted -pace work to be performed over the next 11 months. <br />This will include some preliminary cost estimates to include: <br />Prefab restroom and support building with delivery @ $274k (projected to be on City Council's agenda for <br />approval August 26th or September 9th, 2025). Additional costs to install would be included in the bid later on. <br />Sewer and water main construction in the Fall of 2025 @, $132k (staff to obtain quotes, with authorization to <br />proceed by Council action in September or October 2025). <br />
The URL can be used to link to this page
Your browser does not support the video tag.