My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/15/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 07/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2025 3:03:25 PM
Creation date
11/17/2025 1:41:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/15/2025
Supplemental fields
Year
%(Da
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Construction in progress <br />• Fall completion anticipated <br />#25-04 Dickenson's Mississippi Estate Street Reconstruction <br />• Construction starting July 14 - Dave Perkins Contracting <br />• Temp water connections required during construction of new watermain <br />• Substantial completion anticipated Fall 2025 <br />#25-05 High Point Street Reconstruction <br />• Construction in progress <br />#25-06 Sortebergs Street Reconstruction <br />• Construction complete <br />• Punch list items are being addressed <br />#25-07 2025 Neighborhood Pavement Overlay Improvements <br />• Rum River Hills complete <br />• Village of Sunfish Lake construction in progress <br />• Late Summer completion anticipated <br />#25-08 Sunwood Drive Crosswalk Repairs <br />• Preparing plans and specifications <br />• Pavement repairs east of Sapphire Street completed separately July 14 - 21 <br />#25-09 2025 Crack Seal Improvements <br />• Construction complete <br />• Final payment soon <br />#25-10 2025 Pavement Rejuvenation <br />• Preconstruction meeting with Corrective Asphalt Materials, LLC was held July 8th <br />• Construction starting soon <br />#25-11 2025 MSA Pavement Marking Improvements <br />e Construction started July 9th <br />#25-12 COR Street Lighting Improvements <br />• Obtaining estimate from Connexus to light Ramsey Parkway and intersections only <br />• Staff will present the proposed lighting plan during the meeting <br />#24-03 2024 NE Ramsey Street Reconstruction <br />• Construction complete <br />• Working on as-builts <br />#24-04 Ford Brook Estates Drainage Improvements <br />• Construction complete <br />• Working on as-builts <br />#24-05 Xkimo St MSA (TH47 to 142nd Avenue) Reconstruction <br />• Substantially complete <br />• Punch list items are being addressed <br />• Contractor proposes mill and overlay to address poor rideability <br />#24-07 2024 Neighborhood Overlay Improvements <br />• Construction complete <br />• Punch list items are being addressed <br />#24-11 Alpine Drive MSA Street Reconstruction (Puma St to CSAH 83) <br />• Construction complete <br />• Punch list items are being addressed <br />#24-13 Fox Ridge Estates Ist and 2nd Additions Street Reconstruction <br />
The URL can be used to link to this page
Your browser does not support the video tag.