Laserfiche WebLink
#23-19 COR Infrastructure Improvements <br />• Construction complete <br />• Working to ensure adequate seed germination before issuing final payment <br />#23-20 COR Mass Grading <br />• Construction complete <br />• Working to ensure adequate seed germination before issuing final payment <br />#21-09 Centralized Water Treatment Plant <br />• Construction in progress <br />• City Council tour in December <br />• Final Completion December 31, 2025 <br />• Mailing general information letters (FA Qs) with 3rd quarter utility bills <br />#20-11 Ramsey Gateway Highway 10 Improvements <br />• Sunfish Lake Blvd grade separations (RR and TH10) substantially complete <br />• Ramsey Blvd grade separations (RR and THIO) substantially complete September 16th <br />• Final completion anticipated June 2026 <br />• Project webpage https://www.anokacountymn.Uov/3918/Hwy-lORamsey-Blvd-Interchange <br />City of Anoka Improvement Projects <br />Ferry Street (Trunk Highway 47) Grade Separation of BNSF Rail Crossing <br />• City -led project <br />• $45M in bonds authorized October 2020 <br />• 2028 construction anticipated <br />Highway 47 Corridor Improvements — Garfield St to Bunker Lk Blvd <br />• Combining with above City -led project <br />• 3-lane design <br />• Received regional solicitation funds for 2027 construction <br />• Permanent signal system at McKinley Street <br />• Construction proposed for 2027 - 2029 <br />Anoka County Improvement Projects <br />• No updates. <br />MnDOT Improvement Projects <br />Highway 10 Mill & Overlay and RCI Improvements <br />• Mill & Overlay US 10/169 pavement from approx. %-mile west of Cleveland/Jarvis Avenue in Elk <br />River to 1/2-mile west of Ramsey Boulevard in Ramsey, including Dayton Rest Area <br />• Construct Reduced Conflict Intersection (RCI) improvements for the intersections of Edison Street <br />and Jarvis Street in Elk River, and Alpine Drive and Beatty Drive in Ramsey <br />• Construct J-Turns <br />• Remove median crossings <br />• Extend pedestrian trail south of US 10/169 from 500-feet East of Adams Street to Edison Street <br />• Construct pedestrian refuge in median of US 10/169 at Jarvis Street <br />• Repair/replace culverts <br />• Construct/repair/replace misc. guardrail treatments <br />• 2027 construction proposed <br />