Laserfiche WebLink
2. SCHEDULE <br />W.TAAU r <br />ti�nco[ nfr�:sY <br />'11R5! IEFYL= J <br />kg <br />TCTMS <br />BASE BO <br />�GHI e <br />- RLICMAn <br />+ Material Selections: Some materials included in the design may need to be modified to accommodate <br />the construction schedule. Our team expects to be engaged in the design process to identify these <br />materials in real-time and to find timely alternatives as needed. We've already identified several <br />materials that we'd like to revise, either to maintain the schedule or improve the finished product, as <br />follows: <br />1. Plans show a precast bridge on sheet L120 (noted as AM-03). Precast bridges carry long lead times <br />and their precise dimensions are often field verified before fabrication begins, which our schedule <br />cannot accommodate. We recommend revising the bridge to be timber or a prefabricated <br />assembly to ensure materials can be delivered on schedule. <br />2. Plans call for Turf Grass across the site, which we would recommend confirming is intended to be <br />sod and not seed. This will help expedite the turf establishment after the project is completed and <br />reduce the likelihood that park patrons and pedestrian traffic will damage the turf before can be <br />established. <br />3 Plan sheet L110 shows fairly extensive pavers (noted as P-05) surrounding decorative concrete. <br />Pavers can be expensive and are very time consuming to install when compared to decorative <br />concrete. We would recommend changing these pavers to decorative concrete to expedite the <br />schedule and reduce the construction cost. <br />4. Decorative concrete types P-01 through P-04 call for fiber reinforcement, which we would <br />recommend changing to wire mesh reinforcement. While it is faster to install fiber reinforcement, <br />the fibers can protrude from the concrete and are not appealing to walk on with bare feet. <br />Considering the combined play and water elements included in this project, fiber reinforcement <br />may not be the best product to use here. <br />WHY H+U? <br />.. <br />What makes H+U Construction different from our competition? It's our people, their <br />0©©0000 <br />commitment to a job well done, their dedication to our clients, and the determination <br />TWIN CITIES <br />to be the best they can be through continuous learning and refinement of their skills <br />LARGEST GENERAL <br />CONTRACTORS <br />in Construction Management. <br />g <br />"'O&AD-*�M <br />Ourteamwork philosophy spreads far beyond our office walls and runs deep between <br />02s <br />our collaborative work with all our partners, clients, architects, engineers, contractors, <br />communities and owners we workwith - resulting in strong, long-lasting relationships. <br />V H+U CONSTRUCTION <br />