My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/25/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 11/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 1:45:24 PM
Creation date
11/25/2025 8:21:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/25/2025
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUOTATION <br />Project : Ramsey Waterfront <br />CNp. NQRTNLAND <br />______RECREATION <br />Phone: 651-815-4097 <br />10085 Bridgewater Bay <br />Woodbury, MN 55129 <br />Email: info@northlandrec.com <br />To: City of Ramsey Date: 11/19/25 <br />7550 Sunwood Drive NW Contact: <br />Ramsey, MN 55303 <br />Sourcewell Contract Pricing <br />City of Ramsey Member # 17939 / Poligon Member # 012621-PPC <br />QTY ITEM DESCRIPTION UNIT EXTENSION <br />Poligon REK (Gable Roof) 16' x 24' <br />3 Shelter All Steel Frame $48,975.00 $146,925.00 <br />Stained Tongue & Groove with Standing Seam Metal Roof <br />4 Columns, 9' eave height, 10:12 pitch <br />Electrical Access and 3 Cutout Locations <br />Poli 5000 Paint System - Standard Color Chart Selection <br />Wind Speed 110 mph / Ground Snow Load 501b <br />Cast -In -Place Anchor Rods, Nuts and Template <br />Stamped Engineered Drawings & Shipping to Ramsey MN <br />1 Allowance Note - Allowance for gable end modifications to accept <br />cedar lap siding by others - actual cost will be determined <br />upon engineered drawings <br />1 Discount Sourcewell Discount <br />Installation Installation of above shelter materials only will be invoiced separately <br />Engineered Drawings Lead Time Currently Is 5-6 Weeks <br />Production Lead Time Is Currently 10-12 Weeks <br />This quote does NOT include installation of the shelter <br />NOT Included Installation of concrete footings, concrete pad, building <br />permits, bonding costs, special inspections, site work, etc <br />Site preparation and restoration by others <br />$10,000.00 <br />-$9,975.00 <br />Sub Total $146,950.00 <br />* Quotation is valid for 30 Days Freight Included <br />* Freight based - shipping to Ramsey MN Tax -Exempt $0.00 <br />* Estimated ship date is TBD based upon engineered drawing approval TOTAL $146,950.00 <br />* Terms based on Based on credit approval - downpayment may be required <br />* Orders will be placed upon receipt of Purchase Order made out to Northland Recreation or your signed acceptance. <br />Quote By: Sue Ayers THANK YOU ! <br />Accepted By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.