My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/25/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 11/25/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 1:45:24 PM
Creation date
11/25/2025 8:21:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/25/2025
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
www.ae2s.com <br />031 RFP 018 CU 3 Relocation $21,596.32 <br />Dewatering for ROW <br />032 Watermain $10,870.65 <br />Connection <br />034 Specialty Urethane Painting $50,440.88 <br />Meeting Modifications <br />Submittal Dedication Plaque <br />145 Modifications <br />Manhole Install and <br />No. 1 Dewatering <br />035A <br />Field <br />Directed <br />$1,374.52 <br />Manhole No. 1 -$19,917.35 <br />036 RFI 056 EIFs Base Flashing $2,131.50 <br />037 Field Filter Masonry Wall $10,596.47 <br />Directed Cut <br />Water Wick <br />038 Connection to Lower <br />039 <br />Field <br />Directed <br />Field Order <br />No. 17 <br />040 Field Transformer Bollards <br />Directed <br />Plate Settler Flow <br />Meter Locations <br />044 RFI 066 Generator Panel Feed <br />041 <br />045 <br />RFP 019 <br />Submittal <br />178 <br />046 RFP 020 <br />Level <br />RWL Route <br />Modification <br />Added Beam <br />Stiffeners <br />Explosion Proof EF <br />Room 109 <br />047 RFI 073 Air Flow Meter <br />048 <br />049 RFP 022 <br />050 RFP 021 <br />052 RFI079 <br />053 <br />054 <br />Field Remote Actuator <br />Directed Hand Stations <br />Valve Actuator <br />Voltage <br />Sludge Line <br />Additional Drop Pipe <br />Sample Pump Power <br />Supply <br />Field Chlorine Tank <br />Directed Lifting Bar <br />Field Closet 104 Ceiling <br />Directed Change <br />$2,408.60 <br />$3,437.04 <br />$4,324.89 <br />$6,921.19 <br />$3,036.94 <br />$5,418.03 <br />$16,880.50 <br />$7,717.05 <br />$25,200.00 <br />$33,887.52 <br />$9,266.22 <br />$2,626.75 <br />$2,869.99 <br />-$624.33 <br />Note: Any extension delays will be approved as a separate Change Order and will not be <br />Contingency Expense. <br />Approved — <br />Construction Contingency Expense 8 <br />Approved — <br />Construction Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 10 <br />Pending — <br />Constructing Contingency Expense 12 <br />Pending — <br />Constructing Contingency Expense 12 <br />Approved — <br />Constructing Contingency Expense 11 <br />Approved — <br />Constructing Contingency Expense 11 <br />Approved — <br />Constructing Contingency Expense 11 <br />Approved — <br />Constructing Contingency Expense 11 <br />Engineer Review <br />Pending — <br />Constructing Contingency Expense 12 <br />Pending — <br />Constructing Contingency Expense 12 <br />included in this Construction <br />Proposal No. 045 — Added Beam Stiffeners: <br />During review of the crane shop drawings, it was determined that additional stiffeners were needed where <br />the W14x43 crane beam connects to the supporting W24x62 beams. These stiffeners are necessary to ensure <br />adequate structural capacity and long-term reliability of the crane system, which is used to lift equipment <br />from the basement to the grade -level loading platform. This proposal includes the labor and materials <br />required to install the stiffeners. <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.