Laserfiche WebLink
AGNEYCONSTRU[TION <br />COMMERLihL 6 INDUSTRIAL LUl1 i RACTORS_ <br />1401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Proposal <br />From <br />Noah Pundsack <br />Attention Date <br />Abby Bowman 9/11/2025 <br />E mail Phone Magney Proposal No. 046 <br />Abigail.Bowman(c�AE2S.com (763) 463-5036 RFP 020 - Explosion Proof Exhaust Fan Room 109 <br />Urgent Please comment X❑ Please review n For your information <br />Total pages, including cover: 1 <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is please to present the following quotation to furnish the necessary labor, <br />material, and equipment required per RFP 020 - Providing an explosion proof exhaust fan. This change <br />involves electrical modifications along with opening up the roof coring through the precast, flashing back in <br />around the intake/vent pipes. See the costs associated with change summarized below. <br />Labor: Core Drill Hollow Core Roof Panels Lift Materials To Low Roof $ 1,650.72 <br />Equipment: Forklift & Core Drill / Bit $ 396.00 <br />Equipment: Misc. Small Tools And Equipment (10% of Labor) $ 165.07 <br />Subcontractor: Erickson Electric Provide Additional Wiring Conduit & Labor $ 6,774.72 <br />Subcontractor: Major Mech Provide Exhaust Fan Ductwork And Install $ 5,134.00 <br />Subcontractor: Central Roofing Cut Open & Reseal Roof Around Pipes $ 2,075.00 <br />Subtotal $ 16,195.51 <br />General Contractor's Overhead $ 435.52 <br />Bond & Insurance premiums $ 249.47 <br />Lump Sum Total: $ 16,880.50 <br />'Additional Calendar Days Required for this Change (Including material lead time): <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noah Pundsack <br />Project Engineer Accepted By Date <br />Page 1 of 1 <br />