Laserfiche WebLink
Erickson Electric <br />Material Cost <br />Material $ 2,720.27 <br />Tax 7.625% $ 207.42 <br />Material MU 10% $ 272.03 <br />Permit $ - <br />Labor Rate/hr Hours <br />PM/Estimator $190 1 $ 190.00 <br />Wireman $180 17 $ 3,060.00 <br />Overtime 1-1/2 $270 0 $ - <br />Overtime double time $360 0 $ - <br />Labor MU 10% $ 325.00 <br />Subcontractor <br />Mat. $ - <br />labor $ - <br />Markup @ 5% $ - <br />Subtotal $ 6,774.72 <br />Bond $ - <br />Total cost for this chanae $ 6,774.72 <br />