Laserfiche WebLink
Management Organization and has provided a copy of such permit to the CITY, if applicable; <br />and <br />b. No occupancy permit shall be issued until the PERMITTEE has: (a) constructed vehicular <br />access to the lot, including the installation of at least one layer of bituminous surfacing; and (b) <br />constructed all utilities and storm water facilities this Agreement requires to serve the lot and <br />such utilities and storm water facilities are in place, operational and accepted by the CITY. <br />SECTION IV <br />ON -SITE LANDSCAPING <br />12. Maintenance Guaranty for Landscaping. It is herein agreed that the PERMITTEE shall <br />provide a maintenance guaranty to ensure the survival of the plantings. Said maintenance guaranty <br />shall consist of cash or an irrevocable letter of credit, approved as to form by the CITY, in the <br />amount of Two Thousand Five Hundred Sixty -Five Dollars and No Cents ($2,565.00) <br />[# plantings (19 trees and 38 shrubs) x cost/planting ($300/tree and $75/shrub) x 30% average non - <br />survival rate], which shall be in effect for a two (2) year period commencing on the date of the <br />CITY's written acceptance of said plantings as part of the Required Improvements. <br />At the end of the two (2) year period, the PERMITTEE shall contact the CITY to schedule a final <br />inspection of the landscaping. The determination that all plantings that have been planted in <br />accordance with the Plans have either survived or have been replaced shall be made by the CITY. <br />Upon approval of the final landscape inspection by the CITY, the maintenance guaranty shall be <br />returned to the PERMITTEE. In the event the PERMITTEE fails to maintain the required <br />plantings for a two (2) year period, the City Council may order the replacement of plantings with <br />CITY day labor and/or by letting contracts and draw upon the escrow for payment. Only the City <br />Council shall have the authority to direct replacement of the plantings and withdraw from the <br />escrow account. The PERMITTEE hereby grants permission and a license to the CITY and/or <br />its contractors and assigns to enter upon the Subject Property for the purpose of replacing <br />plantings in the event of the PERMITTEE default. <br />SECTION V <br />GENERAL <br />13. Easement Document. The CITY and PERMITTEE shall sign a cross -access and maintenance <br />easement document regarding the access roadways directly north of the Subject Property. This <br />document will require the PERMITTEE to construct and maintain that roadway until other users <br />locate along the roadway or it is converted into a public roadway. <br />14. As -Built Record Plan. The PERMITTEE shall provide the CITY with a set of reproducible as - <br />built plans in Computer Aided Drafting (CAD) format upon completion of storm sewer, sanitary <br />sewer, and water connections at the stubs. <br />15. Survey Monumentation. The PERMITTEE must protect all lot corner stakes and survey <br />monumentation at all lot corners. <br />16. Preconstruction Meeting. The PERMITTEE shall schedule and hold a pre -construction meeting <br />with the City Engineer prior to commencing site work. <br />CorTrust Bank, N.A. <br />Development Agreement <br />Page 5 of 9 <br />