Laserfiche WebLink
PAY ESTIMATE #7 (FINAL) <br />Rhinestone Street Bridge Project <br />S.A.P. 199.109-02 <br />CITY OF RAMSEY <br />December 1, 2006 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Bivd. NW <br />Ramsey, MN 55303-6197 <br />RE: Rhinestone Street Bridge -S.A.P. 199-109-02 <br />Contractor. Redstone COnstrUCtlOn <br />Contract Amount: $995,791.82' <br />Award Date: October 13, 2004 <br />Completion Date: August 15, 2005 <br />Dear Council Members: <br />The following work has been completed on the above-referenced project by Redstone Construction <br />BID SCHEDULE "A" S.A_P_ 199.109-02 - RHINESTONE STREET 6RI~GE Redefene CnnHnicffnn <br />Engineer <br /> <br />Item <br />Description <br />Estimated Quanta <br />Unit Price <br />Contract Price se o <br />Date <br />Extension <br />1 MOBILIZATION 1 LS $53,310.91 $ 53,310.91 1 $ 53,310.91 <br />2 COMMON EXCAVATION 1040 CY $6.77 $ 7,040.80 loco S 7,04060 <br />3 SELECT GRANULAR MATERIAL 10% CV) 1430 CY $15.48 $ 22,136.40 1430 $ 22,136.40 <br />4 SELECT GRANULAR BORROW CV) 150 CY $14.16 $ 2,24.00 150 $ 2,124.00 <br />5 AGGREGATE BASE (CV) CLASS 5 MOD) 128 CY $33.27 $ 4,258.56 123.2 $ 4 098.86 <br />6 CONCRETE PAVEMENT STD. VNDTH 7.0' 136 SY $71.53 $ 9,728.08 112 $ 8,011.36 <br />7 STRUCTURAL CONCRETE 27 CY $100.64 $ 2,717.28 30 $ 3,019.20 <br />8 BRIDGE APPROACH PANEL 1.74 EACH $i8 875.79 $ 32,843.87 1.74 $ 32,843.87 <br />9 STRUCTURAL CONCRETE (1A43 197 (P) CU. YD. $241.38 $ 47,551.86 197 $ 47,551.86 <br />10 STRUCTURAL CONCRETE (3Y43 385 (P) CU. YD. $384.59 $ 148,067.15 385 $ 148,067.15 <br />11 STRUCTURAL CONCRETE (3Y36 386 P) CU. YD. $291.93 $ 112,684.98 386 $ 112 684.98 <br />12 TYPE MODIFIED P-2 RAILING CONCRETE (3Y46) 249 (P) LIN. FT. $84.14 $ 20,950.86 249 $ 20,950.86 <br />13 SIDEWALK CONCRETE 3Y46) 1475 (P) SO. FT. $6.22 $ 9,174.50 1475 $ 9,174.50 <br />14 REINFORCEMENT BARS 13165 (P) POUND $0.90 $ 11,848.50 13165 $ 11,848.50 <br />15 REINFORCEMENT BARS (EPOXY COATED 139900 P} POUND $0.88 $ 123,112.00 139800 $ 123 112.00 <br />16 STRUCTURE EXCAVATION 0.94 LUMP SUM $11,119.18 $ 10,452.03 0.94 $ 10,452.03 <br />17 FOUNDATION PREPARATION 1 LUMP SUM $36,131.95 $ 36,131.95 1 $ 36,131.95 <br />18 ORNAMENTAL METAL RAILING TYPE SPECIAL 311 (P) LIN. FT. $166.69 $ 51,840.59 311 $ 51,840.59 <br />19 STRUCTURAL TUBE RAILING DESIGN T 1 224 (P) LIN. FT. $92.72 $ 20,769.28 224 $ 20,769.28 <br />20 EXPANSION JOINT DEVICES TYPE 4 110 LIN. FT: $116.57 $ 12,822.70 114.2 $ 13,312.29 <br />21 BEARING ASSEMBLY 12 EACH $683.02 $ 10,596.24 12 $ 10,596.24 <br />22 DRAINAGE SYSTEM TYP (8910} 0.87 LUMP SUM $1,106.09 $ 962.30 0.87 $ 962.30 <br />23 CONCRETE WEARING COURSE {3U17A) 5550 (P) SO. FT. $6.22 $ 34,521.00 5550 $ 34,521.00 <br />24 C.I.P. CONCRETE PILING DELIVERED 1Y 3090 LIN. FT. $21,93 $ 67,763.70 3026.5 $ ~ 66,371.15 <br />25 C.I.P. CONCRETE PILING DRIVEN 12' 3090 LIN. FT. $1.13 $ 3,491.70 2871 $ 3,244.23 <br />26 C.I.P. CONCRETE TEST PILE, 65 FT.LG. 12' 4 EACH $7,356.17 $ 29,424.68 4 $ 29,424.68 <br />27 C.I.P. CONCRETE TEST PILE, 75 FT.LG.12' 2 EACH $8,487,89 $ 16,975.78 2 $ 16,975,78 <br />28 CONDUIT SYSTEM (LIGHTING) 1 LUMP SUM $16,091.38 $ 16,091.38 1 $ 16,091,38 <br />29 4' CONCRETE WALK 1242 SF $4,73 $ _ 5,874.66 1120 $ 5,297,60 <br />30 6" CONCRETE WALK 120 SF $6.86 $ 823.20 0 $ <br />31 CONCRETE CURB AND GUTTER DESIGN 6618 160 LF $26.07 $ 4,171.20 160 $ 4,171.20 <br />32 INTEGRANT CURB 8< GUTTER DESIGN B6 S9 LF $14.36 $ 847.24 53.5 $ 768.26 <br />33 PEDESTRIAN CURB RAMP 2 EA $686.25 $ 1,372.50 0 $ <br />Total Bid Schedule "A" -Rhinestone Street Bridge <br />$ 932,461.88 $ 926,905.22 <br />' Revised Per Change Order No. 2 <br />-7 9- <br />RA3173PEPay Estimate;r7 PE - 1 <br />