My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/28/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 12/28/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:57:53 PM
Creation date
12/21/2006 3:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/28/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey Municipal Center <br />CHANGE ORDER <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN <br />PROJECT NUMBER: <br />PROJECT NAME: <br />CHANGE ORDER NUMBER: <br />DATE: <br />CONTRACTOR DATE: <br />CONTRACTOR FOR: <br />060229 <br />Municipal CenterlConstructionlContracts\1061 -George Cook <br />ORIGINAL <br />1061-16- <br />15-Nov-2006 <br />25-May-2005 <br />RM-1061: General Trades <br />TO CONTRACTOR: George F. Cook Construction Co <br />2300 Nevada Ave N, Suite 200 <br />Golden Valley, MN 55427 <br />The Contract is changed as fiollows: <br />Additional safety rails. Add $6,158.00. <br />FCA 140 -.Relocate projection screen, located above ceiling in Training Add $544.00 <br />room F160 Approx 4" to the north at direction of Construction Manager. <br />FCA 181 -Install laminate panels behind microwaves Add $189.00 <br />FCA 186 -Provide Fire Extinguisher Lettering for FE doors. Add $225.00 <br />FCA 187 -Cut down wood door panels for reception F120 Add $1,443.00 <br />FCA 188 -Provide additional SKD-1, SKD-2, and GGM keys Add $322.00 <br />FCA 194 -Change key funchtion at F193, F149A and F149C. Provide Add $650.00 <br />blank cylinders to cover holes where keyed cylinder is removed. <br />FCA 80 -Provide plywood at area A lobby clerestory windows Add $3,174.75 <br />Furnish and install window blinds at S215 B, C, D, E F and F239C. Add $5,161.00 <br />Omit temporary stair A Credit $2,456.00 <br />PR 72 R - Televsion bracket changes Add $606.00 <br />TOTAL CHANGES: Add $16,016.75 <br /> <br />Not valid until signed by the genera{ contractor and the owner. <br />Signature of the owner ind'scates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br /> <br />The Original Contact Amount was $698,000.00 <br />Net change by previously authorized Change Orders $46,654.52 <br />The Current Contract Amount prior to this Change Order was $744,654.52 <br />The Current Contract Amount will be increased by this Change Order in the amount of ~ $16,016.75 <br />The new Current Contract Amount including this Change Order will be $760,671.27 . <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is 31-Aug-2006 <br />-1~$- <br />George F. Cook Construction Co <br />Golden Valley, MN <br />ON~TRAC 0 <br />By ~ ~ ~22- o~ <br />City of Ramsey <br />Ramsey, MN <br />yr~.:~2'-!~O~ <br />BKV Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.