My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/16/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 12/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2025 9:54:54 AM
Creation date
12/15/2025 11:42:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/16/2025
Supplemental fields
Year
%(Da
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Construction complete <br />• Punch list items are being addressed <br />#25-05 High Point Street Reconstruction <br />• Construction complete <br />• Punch list items are being addressed <br />#25-06 Sortebergs Street Reconstruction <br />• Construction complete <br />• Punch list items are being addressed <br />#25-07 2025 Neighborhood Pavement Overlay Improvements <br />• Construction complete <br />• Punch list items are being addressed <br />#25-08 Sunwood Drive Crosswalk Repairs <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#25-12 COR Street Lighting Improvements <br />• Street lights proposed along Ramsey Parkway and at intersections <br />• 2026 construction proposed <br />• See separate case requesting a recommendation for City Council to authorize Connexus Energy to <br />provide design services <br />#25-58 Waterfront Water Play Area Improvements <br />• City utilities work complete (IP #25-51) <br />• Mass grading work complete (IP #25-62) <br />• Plan preparation almost complete <br />• LRRWMO Permit application will be submitted soon for potential approval January 15, 2026 <br />• Construction proposed to begin February 2026 <br />#24-03 2024 NE Ramsey Street Reconstruction <br />• Construction complete <br />• Closing project out <br />#24-13 Fox Ridge Estates 1st and 2nd Additions Street Reconstruction <br />• Construction complete <br />• Closing project out <br />#24-51 TH 47 Trail Gap Connection — 142nd Avenue to Xkimo Street <br />• Bolton & Menk prepared draft construction plans and specifications for 10' pedestrian trail <br />• Plans need updating per final grading of Complete Auto and Lightbridge Academy developments <br />• MnDOT proposes to construct this trail with their 2028 TH 47 mill and overlay project <br />#21-09 Centralized Water Treatment Plant <br />• Construction in progress <br />• City Council will tour in January when operational <br />#20-11 Ramsey Gateway Highway 10 Improvements <br />• Project complete <br />• Punch list items are being addressed <br />
The URL can be used to link to this page
Your browser does not support the video tag.