My WebLink
|
Help
|
About
|
Sign Out
Home
2007 - 2011
Ramsey
>
Finance
>
Capital Improvement Program
>
2007 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 2:04:58 PM
Creation date
1/2/2007 2:56:49 PM
Metadata
Fields
Template:
Finance
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Capital Improvement Program <br /> <br />City of Ramsey, Minnesota <br /> <br />2007 thru 2011 <br /> <br />Contact <br />Department Park Improvements <br /> <br />Project # <br /> <br />06-PARK-013 <br /> <br />Type Improvement <br />Useful Life 20 Years <br /> <br />. <br /> <br />Project Name Peltzer Park Connections <br /> <br />Category Park Improvement <br />Priority nla <br /> <br />Description -I Total Project Cost $25,000 <br />Extending the access trail to the play equipment - around the cui de sac easterly to right-of-way on 148th lane. <br />The second connection, further to the east, would require acquisition of part ofthe lot presently managed by MPCA. This would allow for street, <br />and/or trail connections from 148th to the cui de sac of Garnet Street. <br />Justification I <br />Two important trail opportunities exist relative to Peltzer Park. The first is immediately available, and consists of extending the access trail to the <br />play equipment - around the cui de sac easterly to right-of-way on 148th lane. This provides residents of Regency Ponds more of a direct access to <br />the park. <br />The second connection, further to the east, would require acquisition of part ofthe lot presently managed by MPCA. This would allow for street, <br />and/or trail connections from 148th to the cui de sac of Garnet Street, and thereby improve access to both Peltzer and Alpine Parks - as well as <br />provide a circuitous walking loop within these neighborhoods. (See also Savanna Trail bridge.) <br />Modest signage and improved landscape at Peltzer would be a benefit as well. <br /> <br />Expenditures <br />Improvements Other than Build <br /> <br />Total <br /> <br />2007 <br /> <br />2008 <br /> <br />2009 <br />25,000 <br />25,000 <br /> <br />2010 <br /> <br />2011 <br /> <br />Total <br />25,000 <br /> <br />25,000 <br /> <br />. <br /> <br />Funding Sources <br /> <br />Park Improvement Trust Fund <br /> <br />Total <br /> <br />2007 <br /> <br />2008 <br /> <br />2009 <br />25,000 <br />25,000 <br /> <br />2010 <br /> <br />2011 <br /> <br />Total <br />25,000 <br /> <br />25,000 <br /> <br />. <br /> <br />Revised 09106 <br /> <br />-115- <br />
The URL can be used to link to this page
Your browser does not support the video tag.