Laserfiche WebLink
<br /> City of Ramsey, Minnesota <br />. Capital Improvement Program <br /> 2007 thru 2011 <br /> PROJECTS BY CATEGORY <br /> Category Project# Priority 2007 2008 2009 2010 2011 Total <br /> IWater Utility Improvement , <br /> WM Looping: Alpine Dr. (CSAH 5 to Germainium St.) 04-WTR-001 0 50,000 50,000 <br /> WM Looping: Alpine Park to Regency Pond 04-WTR-002 0 185,000 185,000 <br /> Renovate Pump House 2 04-WTR-004 0 60,000 60,000 <br /> Complete Pump House 3 04-WTR-005 0 40,000 40,000 <br /> RTC Phase 2 Watermain 04-WTR-008 0 155,000 155,000 <br /> RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd) 04-WTR-009 0 225,000 225,000 <br /> South Highway 10 Frontage Road 04-WTR-015 0 78,000 78,000 <br /> Sunfish Lake Blvd: Replace Stuck Valves 04-WTR-016 0 10,000 10,000 <br /> Water Treatment Plant Construction 04-WTR-017 0 18,400,000 18,400,000 <br /> Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-018 0 226,100 226,100 <br /> Elmcrest Park Water Tower OS-WTR-001 0 2,000,000 2,000,000 <br /> 1.5 MG Ground Storage Reservoir 05-WTR-004 0 2,000,000 2,000,000 <br /> CR 57 Watermain Extension Sunwood-Fox Knoll 05-WTR-005 0 200,000 200,000 <br />. Tower No 1 and PH No 3 Landscape Irrigation 06-WTR-001 0 13,000 13,000 <br />Water Utility Security Improvements 06-WTR-002 0 21,000 21,000 <br /> WELL#1 REHABILITATION 07-WTR-001 0 20,000 20,000 <br /> Water Utility Improvement Total 544,000 22,713,000 426,100 23,683,100 <br /> GRAND TOTAL 544,000 22,713,000 426,100 23,683,100 <br /> <br />. <br /> <br />Revised 09/06 <br /> <br />-240- <br />