|
<br /> City of Ramsey, Minnesota
<br />. Capital Improvement Program
<br /> 2007 thru 2011
<br /> PROJECTS BY CATEGORY
<br /> Category Project# Priority 2007 2008 2009 2010 2011 Total
<br /> IWater Utility Improvement ,
<br /> WM Looping: Alpine Dr. (CSAH 5 to Germainium St.) 04-WTR-001 0 50,000 50,000
<br /> WM Looping: Alpine Park to Regency Pond 04-WTR-002 0 185,000 185,000
<br /> Renovate Pump House 2 04-WTR-004 0 60,000 60,000
<br /> Complete Pump House 3 04-WTR-005 0 40,000 40,000
<br /> RTC Phase 2 Watermain 04-WTR-008 0 155,000 155,000
<br /> RTC Bunker Lake Blvd (Armstrong to Ramsey Blvd) 04-WTR-009 0 225,000 225,000
<br /> South Highway 10 Frontage Road 04-WTR-015 0 78,000 78,000
<br /> Sunfish Lake Blvd: Replace Stuck Valves 04-WTR-016 0 10,000 10,000
<br /> Water Treatment Plant Construction 04-WTR-017 0 18,400,000 18,400,000
<br /> Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04-WTR-018 0 226,100 226,100
<br /> Elmcrest Park Water Tower OS-WTR-001 0 2,000,000 2,000,000
<br /> 1.5 MG Ground Storage Reservoir 05-WTR-004 0 2,000,000 2,000,000
<br /> CR 57 Watermain Extension Sunwood-Fox Knoll 05-WTR-005 0 200,000 200,000
<br />. Tower No 1 and PH No 3 Landscape Irrigation 06-WTR-001 0 13,000 13,000
<br />Water Utility Security Improvements 06-WTR-002 0 21,000 21,000
<br /> WELL#1 REHABILITATION 07-WTR-001 0 20,000 20,000
<br /> Water Utility Improvement Total 544,000 22,713,000 426,100 23,683,100
<br /> GRAND TOTAL 544,000 22,713,000 426,100 23,683,100
<br />
<br />.
<br />
<br />Revised 09/06
<br />
<br />-240-
<br />
|