Laserfiche WebLink
proposed to be replaced as part of this improvement. Televising of the lines to confirm their conditions will be <br />performed. The remaining street crossing culverts within the subdivision are proposed to be replaced and updated <br />to reinforced concrete pipe. Only minor grading of the ditches to tie -into the new culverts is proposed. <br />The reconstruction of the streets within Countryside Estates are proposed to be a Full -Depth Reclamation (FDR). <br />Typical impacts of FDR projects including matching into driveways and boulevards approximately 6 to 8 feet <br />from the edge of pavement is anticipated. To achieve the proposed pavement section of 3.5-inches of bituminous <br />over 4.0-inches of aggregate base (made up of recycled FDR material), the project will require over excavating <br />2-inches of subbase material. <br />The reconstruction of the streets within Wildwood Acres are proposed to be a Reclamation. Typical impacts of <br />reclamation projects include 1 to 2 feet of the boulevard adjacent to the pavement, as required to keep any <br />vegetation and/or topsoil out of the reclamation. Driveway impacts are not anticipated. This process will include <br />reclamation of the existing bituminous and aggregate base, hauling out 2.5-inches of excess reclamation material <br />and replacing with 2.5-inches new bituminous pavement on top of the in -place reclamation. <br />Restoration of the impacted boulevards will include a minimum of 4-inches topsoil and hydroseed with a <br />residential turf seed mix. <br />Municipal utilities do not exist within the project area, extension of municipal utilities to this subdivision are not <br />proposed as it is outside of the 2040 MUSA. <br />Preliminary Schedule Remaining <br />• Council approves plans and specifications / authorizes ad for bids <br />o January 13, 2026 <br />• Staff Receives Bids <br />o February 11, 2026 <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o February 24, 2026 <br />• Contractor Begins Construction <br />o Spring / Summer 2026 <br />• Contractor Substantially Complete Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o August 28, 2026 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o September 30, 2026 <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical sections, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Notification: <br />If City Council approves plans and specifications and authorizes advertising for bids, bids will be advertised on <br />Friday, January 16, and again on Friday, January 23, 2026, in the City's official newspaper, the Anoka Union <br />Herald. Plans are also advertised on the QuestCDN website, which directly notifies contractors interested in <br />bidding these types of projects. <br />Additionally, letters will be mailed to property owners with updates on the project status. Engineering staff <br />maintains City Improvement webpages with the most current project information. This can be found on the city <br />website, Engineering Department page. <br />