Laserfiche WebLink
#26-08 2026 Neighborhood Pavement Overlay Improvements <br />• Design services RFP issued for plans and specifications preparation <br />• 2026 construction proposed <br />#26-09 2026 Crack Seal Improvements <br />• Prepared plans and specifications in-house <br />• 2026 construction proposed <br />• See separate case <br />#26-10 2026 Pavement Rejuvenation Improvements <br />• Prepared plans and specifications in-house <br />• 2026 construction proposed <br />• See separate case <br />#26-11 2026 Pavement Marking Improvements <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#25-03 MSAAlpine Drive Reconstruction — CSAH 57 to TH 47 <br />• Construction complete <br />• Closing project out <br />#25-04 Dickenson's Mississippi Estate Street Reconstruction <br />• Construction complete <br />• Closing project out <br />#25-06 Sortebergs Street Reconstruction <br />• Construction complete <br />• Closing project out <br />#25-08 Sunwood Drive Crosswalk Repairs <br />• Preparing plans and specifications in-house <br />• 2026 construction proposed <br />#25-12 COR Street Lighting Improvements <br />• Street lights proposed along Ramsey Parkway and at all intersections <br />• 2026 construction proposed <br />#25-58 Waterfront Water Play Area Improvements <br />• City utilities work complete (IP #25-51) <br />• Mass grading work complete (IP #25-62) <br />• Final plans complete <br />• LRRWMO Peiinit application to be considered for approval on February 19th <br />• Construction start late February/early March <br />• Construction completed by July <br />• See separate case <br />