Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />CITY. Chipped material may be applied and utilized on site to mitigate root damage <br />from grade changes or used in the right-of~way for erosion control and top soil <br />restoration. <br /> <br />SECTION V ' <br />GENERAL <br /> <br />18. Payment of Sewer and Water Trunk Charges. The plat will be subject to trunk sewer and <br />water fees for each newly created lot. The 2007 rate is $1,171.00 for trunk sewer fees and <br />$1,973.00 for trunk water fees. This equates to a total of Fifteen Thousand Seven Hundred <br />Twenty Dollars and no cents ($15,720.00) (5 units x $3,144.00/unit) to satisfy trunk sewer <br />and water fees for the five lots that are being created. <br /> <br />19. Stormwater Management Fee. The2007 Stormwater Management Fee rate is $416.00 per <br />unit, which equates to a payment in tlle amount of Two Thousand Eighty Dollars and no <br />cents ($2,080.00) due to the City prior to the release of the fmal plat for recording. <br /> <br />20. Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Said improvement shall be installed by the building <br />permit applicant or the homeowner at the time the Certificate of Occupancy is issued or as <br />soon thereafter as possible, weather permitting. In the event this improvement is not timely <br />installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the <br />CITY may install said improvement on the lot and specially assess the cost therefore against <br />the lot. The DEVELOPER hereby waives all right to a public hearing and other statutory <br />rights or City Charter rights granted a property owner relating to special assessments, <br />,including the right to appeal the special assessment for installation of the hard surfaced <br />driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br />the Plat in order to install the improvement described in this paragraph if the same ,has not <br />been previously constructed. . <br /> <br />21. Street Cleaning. After the street surfacing is installed, the DEVELOPER shall clear any <br />soil, earth, or debris from the streets within the Plat resulting from any construction within <br />the Plat by the DEVELOPER or its successors and assigns. From time to time, the CITY <br />may remove accumulations of soil, earth and debris from the streets resulting from the <br />.construction of the Plat. It shall be the DEVELOPER'S responsibility to pay the costs <br />associated with this necessary street cleaning. Invoices from the CITY to the DEVELOPER <br />f?r such costs shall be paid within fifteen (15) days of the date of invoice. <br /> <br />22. Mailbox Locations. The DEVELOPER herein agrees to cluster the mailboxes where <br />possible; placement of mailboxes along public streets is subject to the approval of the CITY. <br />Utility locates will be necessary. <br /> <br />Amber Ridge 2/1d Addition <br />Development Agreement <br />Page 8 of 11 <br /> <br />-291- <br />