My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #06-10-338 - 10/24/2006
Ramsey
>
Public
>
Resolutions
>
2006
>
Resolution - #06-10-338 - 10/24/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:21:32 AM
Creation date
1/10/2007 2:54:24 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#06-10-338
Document Date
10/24/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Councilmember Pearson introduced the following resolution and moved for its adoption: <br /> <br />RESOLUTION #06-10-338 <br /> <br />A RESOLUTION AWARDING THE CONTRACT TO NORTHWEST ASPHALT FOR <br />BUNKER LAKE BOULEVARD W ATERMAIN IMPROVEMENTS <br /> <br />WHEREAS, the AUAR prepared for the Ramsey Town center has identified the need for <br />additional well capacity for the City's water utility; and <br /> <br />WHEREAS, Bids have been accepted for the construction ofVVell No.7 and VVell No.8; <br /> <br />and <br /> <br />WHEREAS, extension ofthe existing water system will be required to connect Well No. <br />7 and VVell No.8 to the system; and <br /> <br />WHEREAS, Bolton and Menk, Inc was authorized to prepare plans and specifications <br />for this work; and <br /> <br />WHEREAS, on September 26, 2006 the Ramsey City Council authorized the <br />advertisement for bids; and <br /> <br />WHEREAS, pursuant to an advertisement for bids for the Bunker Lake Blvd VV atermain <br />Improvements, bids were received, opened and tabulated according to law; and <br /> <br />WHEREAS, the following bids were received: <br /> <br />Sunblad Construction Inc. <br />Northwest Asphalt Inc. <br />Northdale Construction Inc. <br />Kuechle Underground Inc. <br />Ryan Contracting Company <br />Randy Kramer Excavating Inc. <br />Glenn ReihbeinCompanies <br />Three Rivers Construction Inc. <br />Dave Perkins Contracting Inc. <br />R L Larson Excavating Inc. <br />Minger Construction Inc. <br />Arcon Contracting Inc. <br />La Tour Construction Inc. <br />Burchville Construction Inc. <br />Kober Excavating Inc. <br />Friedges Contracting Co. LLC <br />Engineers Estimate <br /> <br />$272,085.34 (incomplete) <br />$287,496.29 <br />$295,464.99 <br />$297,913.80 <br />$302,665.32 <br />$304,736.65 <br />$305,000.00 <br />$305,804.84 <br />$307,962.56 <br />$316,493.14 <br />$322,022.48 <br />$328,786.41 <br />$333,383.70 <br />$339,214.75 <br />$349,032.60 <br />$351,255.87 <br />$361,594.65 <br /> <br />RESOLUTION #06-10-338 <br />Page 1 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.