Laserfiche WebLink
Printed on Mon Feb 2, 2026 at 03:59 pm CST <br />Job #: J25027 Ramsey Waterfront Park <br />Ramsey, Minnesota 55303 <br />H+U Construction <br />Drawing No. <br />Drawing Title <br />Revision <br />Drawing Date <br />Received Date <br />Set <br />A4.3 <br />WALL FINISH DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />A4.4 <br />WALL FINISH DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />A5.1 <br />DOOR SCHEDULE <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />A5.2 <br />DOOR DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />A5.3 <br />SIGN DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />Romtec - Structural <br />57.1 <br />FOUNDATION PLAN <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />S7.2 <br />FOUNDATION DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />S7.3 <br />FOUNDATION DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />57.4 <br />CMU WALL STEM WALL DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />58.1 <br />STRUCTURAL CMU PLAN <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />58.2 <br />STRUCTURAL CMU REBAR LAYOUT <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />S8.3 <br />STRUCTURAL CMU DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />58.4 <br />STRUCTURAL CMU ELEVATION VIEWS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />58.5 <br />STRUCTURAL CMU ELEVATION VIEWS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />59.1 <br />ROOF FRAMING PLAN <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />S10.1 <br />ROOF CONNECTION DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />510.2 <br />ROOF CONNECTION DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />Romtec - Roofing <br />R1 <br />ROOFING PLAN <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />R2 <br />ROOFING DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />R3 <br />SKYLIGHT DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />Romtec - Plumbing <br />P1 <br />PLUMBING SCHEDULE <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />P2 <br />PLUMBING WATER PLAN <br />1 <br />01/16/2026 <br />_ <br />Addendum 1 (01/16/26) <br />Romtec - Mechanical <br />M1 <br />MECHANICAL PLAN <br />1 <br />01/16/2026 <br />- <br />Addendum 1 (01/16/26) <br />Romtec - Electrical <br />El <br />ELECTRICAL SCHEDULE <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />E2 <br />ELECTRICAL FLAN <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />E3 <br />ELECTRICAL RISER DETAILS <br />1 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />Winter Blow Out <br />WBO Winterization Blow <br />Out <br />Winterization Blow Out by Mech Contractor <br />0 <br />01/16/2026 <br />Addendum 1 (01/16/26) <br />Page 3 of 3 <br />