My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 2:43:25 PM
Creation date
2/13/2026 1:45:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Waterfront Waterplay N <br />w <br />ID <br />Task Name <br />Duration <br />Start <br />Finish <br />Predecessors <br />ResIBavelineStarr <br />Nan <br />Hell 1, 2025 <br />J <br />F I 'M I A IMI 1 <br />Mall 2, 2626 <br />J I A I 5 I 3 I N I o <br />Nall 1, 2627 <br />J 1 F I M I A I M I J <br />1 <br />THE WATERFRONT WATERPLAY NA <br />2 <br />Rennin Building NA <br />3 <br />Romtec Footing Excavation 3 days Mon 3/2/26 Wed 3/4/26 NA <br />0% trRomtec Footing Excavation <br />1 <br />Romtec Footings and Foundations 10 days Thu 3/5/26 Wed 3/18/261 NA <br />0% A V Romtee Footings and <br />Foundations <br />5 <br />Romtec Water and Sewer tine 10 days Thu 3/5/26 Wed 3/18/26 NA <br />0% A y Rorntec Water and <br />Sewer Line <br />6 <br />Romtec • Backfill Foundations 2 days Thu 3/19/26 Fri 3/20/26 5 NA <br />0% a Romtec - Backfill Foundations <br />7 <br />Romtec Underground Plumbing 3 days Mon 3/23/26 Wed 3/25/26 NA <br />0% m Romtec Underground <br />Plumbing <br />a <br />Romtec Masonry Walls and MEP RI 20 days Thu 3/26/26 Wed 4/22/26 NA <br />0% A y Rorntec Masonry <br />Walls and MEP RI <br />5 <br />Romtec Roof 10 days Thu 4/22/26 Wed 5/6/26 8 NA <br />0% j: ■ Rorntec Poof <br />10 <br />I Romtec Interior Slah 2 days Thu 5/7/26 Fri 5/6/26 9 NA <br />0% j Rorntec <br />interior Slab <br />11 <br />Romtec Interior Finishes 15 days Mon 5/11/26 Fri 5/29/26 NA <br />0% A y Reenter <br />Interior Finishes <br />12 <br />Romtec Exterior Finishes 15 days Mon 5/11/26 Fri 5/29/26 NA <br />0% A y Rorntec <br />Exterior Finishes <br />13 <br />Rorntec MEP Finishes 5 days Tue 6/2/26 Mon 6/8/26 NA <br />0% Ayi Re <br />ntec MEP Finishes <br />14 <br />Romtec Partitions and Accessories 5 days Tue 6/9/26 Mon 6/15/2613 NA <br />0% itr Rorntec <br />Partitions and Accessories <br />1S <br />Romtec Final Cleaning 2 days Thu 6/25/26 Fri 6/26/26 NA <br />0% i <br />Rorntre Final Cleaning <br />16 <br />splash Pad Piping and Electrical 62 days Mon 4/6/26 Tue 6/30/26 NA <br />0% l Splash Pad Pioi,g <br />and Electrical <br />17 <br />Splash Pad R/1 Piping/Electrical 15 days Mon 4/6/26 Fri 4/24/26 NA <br />0% A ty <br />Splash Pad <br />R/I P•ipiny)Electrical <br />1s <br />Splash Pad Work in Pongee 10 days Fri 5/15/26 Thu 5/26/26 NA <br />0 <br />3-7 Splash <br />Pad Work in Romtec <br />19 <br />Splash Pad Uevicing/Testing/Programm 15 days Wed 6/10/26Tue 6/30/26 NA <br />°I% A V <br />Splash Pad bevicing/Testing/Nrogramming <br />20 <br />Earthwork 77 days Mon 3/2/26 Tue 6/16/26 NA <br />0% <br />21 <br />Romtec Footing Excavation 3 days Mon 3/2/26 Wed 3/4/26 NA <br />0% ■ Romtec Footing Excavation <br />22 <br />Romtec Foundation Backfill 2days Thu 3/19/26 Fri 3/20/26 NA <br />0% ■ Romtec Foundation <br />Backfill <br />23 <br />Place Gravel Base S days Fri 5/1/26 Thu 5/7/26 17 NA <br />0% Ly Place Gravel <br />Base <br />24 <br />Place Stones - Splashpad Area 10 days Fri 5/6/26 Thu 5/21/26 23 NA <br />0% AT7 <br />Place <br />Stones - Splashpad Area <br />25 <br />Area Drain R/I 2 days Fri 5/15/26 Mon 5/18/26 NA <br />0% 1 <br />Area Drain <br />RA <br />26 <br />Place Topsoil In Splashpad Islands 5 days Mon 5/11/26Fri 5/15/26 NA <br />0% m ace Topsoil <br />in Splashpad Islands <br />27 <br />Grading Confirmations - Splashpad Are23 days Fri 5/22/26 Tue 5/26/26 24 NA <br />8% Grading <br />Confirmations - Splashpad Area <br />2s <br />Place Stones outside of Splashpad Area 10 days Wed 5/27/26 Tue 6/9/26 27 NA <br />0% Place <br />Stones outside of Splashpad Area <br />29 <br />Place Topsoil outside of Splashpad Areas days Wed 6/10/26Tue 6/16/26 26 NA <br />0 Place <br />Topsoil outside of Splashpad Area <br />30 <br />Site Cmnerete 22 days Fri 5/15/26 Tue 6/23/26 NA <br />0% <br />rete <br />31 <br />Splash Pad Concrete 15 days Wed 5/27/26 Tue 6/16/26 27 NA <br />0% A yj <br />Splash 'Pad Concrete <br />32 <br />Site Footings 5 days Fri 5/15/26 Thu 5/21/26 NA <br />0% A7 <br />Site <br />Footings <br />33 <br />Other Site Concrete 5 days Wed 6/17/26 Tue 6/23/26 31 NA <br />II% <br />A <br />Other Site Concrete <br />34 <br />Fire Pit R/I 3 days Wed 4/15/26 Fri 4/17/26 NA <br />0% A Fire Pit <br />R/1 <br />35 <br />Cantenary Light Posts and Hammock Post13 days Mon 4/20/26 Wed 4/22/2634 NA <br />0% it Cantenary <br />Light <br />Posts and Hammock Posts <br />36 <br />Pawillfon Install (1) 10 days Fri S/22/26 Thu 6/4/26 32 NA <br />0% A"ry Parillioel <br />Install (3) <br />37 <br />Site Amenity Install 15 days Thu 6/11/26 Wed 7/1/26 NA <br />0% A y <br />Site Amenity Install <br />35 <br />Site Lighting R/1 and Footings 10 days Wed 4/15/26Tue 4/28/26 NA <br />0% A V Site Lighting <br />RA and Footings <br />39 <br />Trash Enclosure Install 5 days Thu 5/21/26 wed 5/27/26 NA <br />0% A,g Trash <br />Enclosure Install <br />40 <br />41 <br />Landscaping 25 days Thu 5/28/26 Wed 7/1/26 NA <br />Project Completion 1 day Wed 7/1/26 Wed 7/1/26 NA <br />0% A IF Landscaping <br />0% yD Project Completion <br />