My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 2:43:25 PM
Creation date
2/13/2026 1:45:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chairperson Olson asked if there would be a financial benefit to completing this in two phases or <br />whether there is a cost savings to doing the work in one project. <br />City Engineer/Public Works Director Westby replied that with roads, they look for opportunity - <br />driven elements where developers could contribute towards the cost. He noted additional <br />development that will occur, such as the extension of Veterans Drive, where developers would <br />assist with the installation of lights. He stated that with the development that has occurred, they <br />know where these lights should go, and more pedestrians will be actively using The COR, <br />especially after the Waterfront infrastructure, including splashpad, is constructed. <br />Chairperson Olson asked for information on the driver between the original design and what is <br />currently proposed. <br />City Engineer/Public Works Director Westby replied that the COR design framework street <br />lighting plan was overkill in his opinion and believes this is a more reasonable lighting plan. He <br />stated that the recommended lighting plan will improve safety for pedestrians and drivers, but will <br />also not fall into the category of light pollution. <br />Chairperson Olson confirmed that this plan is more right -sized for the COR as it has developed. <br />He asked if the spacing of the lighting provides an opportunity for additional lights to be installed <br />between if that is determined necessary. <br />City Engineer/Public Works Director Westby was unsure how that could work. He stated that <br />Connexus does the design and the electrical line that is installed supports the design needs, noting <br />that if additional lights were needed, a larger electrical line may be needed. He does not believe <br />that additional lights would generally be needed in the future. <br />Motion by Councilmember Riley, seconded by Councilmember Specht, to recommend City <br />Council authorization for Connexus Energy to provide design services for the 2026 COR Street <br />Lighting Improvements. <br />Motion carried. Voting Yes: Chairperson Olson, Councilmembers Riley and Specht. Voting No: <br />None. <br />Councilmember Riley asked if the Committee would discuss the frontage road and the other two <br />projects identified in the CIP. <br />City Engineer/Public Works Director Westby confirmed that is the plan, and provided information <br />on the anticipated timeline. <br />6. COMMITTEE / STAFF INPUT <br />6.01: Receive Updates on Improvement Projects, Studies, and Items of Interest <br />Public Works Committee / December 16, 2025 <br />Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.