Laserfiche WebLink
<br />Associate Planner Dalnes replied very few. The only other option would be on the north side. <br />The geothermal field takes up about ~ of the property, and the parking lot takes up another good <br />portion. There are also the secondary and primary septic system sites. In working with the <br />Engineering Department this location was determined based on the setbacks and the Fire Chief s <br />request for a future storage facility. <br /> <br />Commissioner Van Scoy asked the applicant to address the safety concerns of a 10 foot setback. <br /> <br /> <br />Mr. Steven Edwards, representative of T-Mobile indicate <br />He has never heard of a monopole failing, but if they do <br />themselves. The top of the tower, which will co e <br />the wind. If anything below were to fail, the st at <br />itself; it would not create a situation where steel <br /> <br />ole is a very safe design. <br />esigned to collapse onto <br />. 1 receive the majority of <br />sentially collapse onto <br /> <br />Commissioner Van Scoy asked if it is standard in <br />the property line. <br /> <br />de. There are instances <br />ilding. <br /> <br />Chairperson Nixt questioned if there is <br />DaInes replied not directly adjacent. <br /> <br />2 times the tower in a residential <br />ss district is not motivated towards <br />each district. So it primarily goes to <br />an Scoy's concerns, given the lack of <br />e10pment there will be an opportunity to design the <br />er that would accommodate the existing tower or <br />Comprehensive Land Use Plan for 2008, the land <br />developed may undergo changes. Given those <br />a safety e, he would move away from that as a motivating <br />courage staff to work with the applicant to find out how much <br />odate the City's interest in preserving space for the future <br />g aesthetic and other concerns related to the placement of <br />future residential development. <br /> <br />Civil Engin <br />meet the conce <br />tower internal to <br />north property line tha <br /> <br />d staff is working on evaluating the site plan to better define and <br />preserve space for the Fire Station future needs, and yet keep this <br />much as possible. He noted there is a large stand of trees along the <br />11 screen and buffer the site. <br /> <br />Commissioner Trites Rolle commented there will also be a landscaping plan. The City has <br />somewhat created this issue by its need for the land where the tower is currently located, and it <br />sounds that all the other options have been exhausted in the area. <br /> <br />-330- <br />