Laserfiche WebLink
AET Proposal for 2026 Geotechnical and Construction Testing Services <br />City of Ramsey, Minnesota <br />February 16, 2026 <br />Project: Andover Crossing — 2022 <br />Details: AET provided construction materials testing for a new mixed used development that included <br />soils testing for grading work and utility installation, concrete testing for curb and gutter and sidewalk, <br />and bituminous testing. <br />Contact: Jason Law, Jake Knutson — City of Andover <br />City of Albertville <br />Project: Main Avenue Reconstruction — 2025-Present <br />Details: AET provided geotechnical services and is providing construction materials testing for the <br />reconstruction of Main Avenue in Albertville, MN. This project includes State -Aid funding and AET is <br />assisting with documentation and materials summary reports throughout the project for state aid <br />requirements. Construction is anticipated to be completed in 2026. <br />Contact: Adam Nafstad — City of Albertville <br />City of Minnetonka <br />Project: Mill and Overlay, 2025 <br />Details: AET provided geotechnical services and construction testing for nine new bridges over trails. <br />This included soil borings and preparation of a geotechnical report and recommendations. We provided <br />the Quality Assurance (QA) Testing (using MnDOT certified testers) that included compaction testing, <br />MnDOT DCP testing, sieve analyses, concrete testing, and bituminous testing. <br />Contact: Chris Smi and Mitch Hatcher - City of Minnetonka <br />Project: SAP 142-152-010 Wayzata Boulevard Improvements, 2024 <br />Details: AET provided geotechnical services and construction testing for nine new bridges over trails. <br />This included soil borings and preparation of a geotechnical report and recommendations. We provided <br />the Quality Assurance (QA) Testing (using MnDOT certified testers) that included compaction testing, <br />MnDOT DCP testing, sieve analyses, concrete testing, and bituminous testing. <br />Contact: AJ Soland and Mitch Hatcher - City of Minnetonka <br />Project: Opus Bridges, Phases 1, 2, and 3, 2020-2023 <br />Details: AET provided geotechnical services and construction testing for ten new bridges over trails. <br />This included soil borings and preparation of a geotechnical report recommending Geosynthetic <br />Reinforced Soil (GRS) bridge abutments. We also provided the Quality Assurance (QA) Testing (using <br />MnDOT certified testers) that included compaction testing, MnDOT DCP testing, sieve analyses, direct <br />shear testing, concrete testing, and bituminous testing. <br />Contact: Chris Long and Chris Smith - City of Minnetonka <br />Project: Opus and Burch Lift Stations and Opus Secondary Forcemain, 2021-2023 <br />Details: AET provided geotechnical services for lift station rehabilitation at the Burch and Opus sites. <br />Borings and geotechnical services were also performed for the new secondary forcemain (to be <br />directionally drilled) from the Opus Lift Station site across a wetland to a new manhole on the west side <br />of the wetland. These projects are in wetland/swamp deposit areas. The reports provided <br />recommendations for support of lift station features, construction considerations with regard high <br />3 <br />