My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/24/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:21:20 PM
Creation date
3/6/2026 9:40:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AET Proposal for 2026 Geotechnical and Construction Testing Services <br />City of Ramsey, Minnesota <br />February 16, 2026 <br />Construction Materials Testing <br />During construction AET will provide experienced MnDOT certified technicians for construction <br />materials testing. Our technicians will be scheduled for density testing, concrete testing, and bituminous <br />testing on an on -call basis to perform the work. AET will provide a field engineer to perform any <br />Excavation Observations if unsuitable soils are encountered during grading of the roadway and will <br />provide a technician to perform soil density testing of the backfill materials used during the sanitary <br />sewer, watermain and storm sewer installation. Our technician will also obtain soil samples as needed <br />for laboratory proctor and density testing. Upon completion of the utility installation our technician will <br />provide soil density testing for the subgrade of the roadway as well as DCP testing for the aggregate <br />base section. If any test results are out of specification City staff will be notified. <br />During the placement of concrete for curb and gutter our technician will verify the proper mix design <br />upon delivery and perform plastic concrete testing for the mix being placed. Our technician will perform <br />temperature, slump, and air entrainment testing of the concrete and verify that all test results meet City <br />and project specifications. If any test results are out of specification City staff will be notified <br />immediately on site. A total of five cylinders will be cast with each test performed (or every 100 cubic <br />yards placed). One cylinder will be tested for compressive strength at 7 days, three cylinders will be <br />tested at 28 days, and one cylinder will be kept as a hold. If the 28 day average compressive strength <br />does not meet specifications then the hold cylinder will be tested at 56 days. <br />During bituminous paving operations our technician will be available on site to observe rolling <br />procedures and establish a rolling pattern with the paving crew. Our Project Manager will coordinate <br />with City staff and the bituminous plant to obtain laboratory split samples of the bituminous mix being <br />placed. Upon completion of paving our Project Manager will prepare the MnDOT coring log for City staff <br />to review, once approved we will mark the cores on the roadway. After coring is completed AET staff <br />will transport the bituminous cores to our St. Paul laboratory for testing and will provide the City with the <br />testing results once completed. <br />All test reports will be published via Construction Hive by the Project Manager and will be distributed to <br />City inspection and administration staff, as requested. <br />Our estimated fee schedule for construction materials testing can be found in the Appendix. <br />KEY PERSONNEL <br />AET is fully staffed and equipped to complete the scope of work for City of Ramsey projects and our <br />lead and support personnel hold the certifications and licenses required to perform their work. Our <br />proposed team includes staff from our Albertville office with support from the St Paul Office, as needed. <br />Proposed team titles and roles are shown in the organizational chart below and the qualifications and <br />experience of key staff in Geotechnical and Environmental services are summarized in bios on the <br />following pages. More detailed resumes are included in the Appendix. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.