AET Proposal for 2026 Geotechnical and Construction Testing Services <br />City of Ramsey, Minnesota <br />February 16, 2026 <br />Construction Materials Testing <br />During construction AET will provide experienced MnDOT certified technicians for construction <br />materials testing. Our technicians will be scheduled for density testing, concrete testing, and bituminous <br />testing on an on -call basis to perform the work. AET will provide a field engineer to perform any <br />Excavation Observations if unsuitable soils are encountered during grading of the roadway and will <br />provide a technician to perform soil density testing of the backfill materials used during the sanitary <br />sewer, watermain and storm sewer installation. Our technician will also obtain soil samples as needed <br />for laboratory proctor and density testing. Upon completion of the utility installation our technician will <br />provide soil density testing for the subgrade of the roadway as well as DCP testing for the aggregate <br />base section. If any test results are out of specification City staff will be notified. <br />During the placement of concrete for curb and gutter our technician will verify the proper mix design <br />upon delivery and perform plastic concrete testing for the mix being placed. Our technician will perform <br />temperature, slump, and air entrainment testing of the concrete and verify that all test results meet City <br />and project specifications. If any test results are out of specification City staff will be notified <br />immediately on site. A total of five cylinders will be cast with each test performed (or every 100 cubic <br />yards placed). One cylinder will be tested for compressive strength at 7 days, three cylinders will be <br />tested at 28 days, and one cylinder will be kept as a hold. If the 28 day average compressive strength <br />does not meet specifications then the hold cylinder will be tested at 56 days. <br />During bituminous paving operations our technician will be available on site to observe rolling <br />procedures and establish a rolling pattern with the paving crew. Our Project Manager will coordinate <br />with City staff and the bituminous plant to obtain laboratory split samples of the bituminous mix being <br />placed. Upon completion of paving our Project Manager will prepare the MnDOT coring log for City staff <br />to review, once approved we will mark the cores on the roadway. After coring is completed AET staff <br />will transport the bituminous cores to our St. Paul laboratory for testing and will provide the City with the <br />testing results once completed. <br />All test reports will be published via Construction Hive by the Project Manager and will be distributed to <br />City inspection and administration staff, as requested. <br />Our estimated fee schedule for construction materials testing can be found in the Appendix. <br />KEY PERSONNEL <br />AET is fully staffed and equipped to complete the scope of work for City of Ramsey projects and our <br />lead and support personnel hold the certifications and licenses required to perform their work. Our <br />proposed team includes staff from our Albertville office with support from the St Paul Office, as needed. <br />Proposed team titles and roles are shown in the organizational chart below and the qualifications and <br />experience of key staff in Geotechnical and Environmental services are summarized in bios on the <br />following pages. More detailed resumes are included in the Appendix. <br />9 <br />