Laserfiche WebLink
Relevant Project Experience <br />Carver CSAH 18, Chaska, MN, SAP 010-618-016 <br />2023-2024 <br />Reviewing Geotechnical Engineer for geotechnical exploration, MDR, and FADR for reconstruction, widening, and <br />new alignment of an existing gravel roadway. Provided recommendations for new bridge over Chaska Creek, <br />infiltration ponds, muck excavation, and pavement designs.Providing review of surcharge settlement monitoring. <br />TH 610 over 1-94, Maple Grove, SP 2771-118, 2780-105 <br />2022-2025 <br />Reviewing Geotechnical Engineer for MDRs for extension of TH 610 west over 1-94, referred to as new Rush <br />Creek Boulevard, and associated ramp/loop extensions for 1-94 and TH 610. Rush Creek Boulevard Project <br />included coordination with city of Maple Grove, Hennepin County, and MnDOT. Providing review of surcharge <br />settlement monitoring during construction. <br />TH 10/169 Reconstruction, Ramsey 2020-2023 <br />Geotechnical Engineer providing review of MDR for the reconstruction of TH 10/169 in the City of Ramsey. Project <br />included several City of Ramsey streets, Anoka County Roads, MnDOT mainline and ramps, four new bridges, <br />overhead signs, many MSE and CIP retaining walls, and large approach embankments. The scope included a life - <br />cycle cost analysis, SPT borings, CPT soundings, Ground Penetrating Radar (GPR), and pavement cores. <br />TH 244 Improvements, Washington County, MN 2019-2022 <br />Provided review of geotechnical surcharge design and slope stability analysis for embankment widening through <br />Lost Lake historic muck -out area, and pavement rehabilitation options, including full depth reclamation (FDR) and <br />cold -in -place recycling (CIR). Field exploration included ground penetrating radar (GPR), falling weight <br />deflectometer (FWD), soil borings, and pavement cores. <br />TH 10/169 Reconstruction, Anoka, SP 0202-108 <br />2019-2021 <br />Geotechnical Engineer providing review of MDR for the reconstruction of TH 10/169 in the City of Anoka. Project <br />included several City of Anoka streets, Anoka County Roads, MnDOT mainline and ramps, two new bridges, <br />widening an existing bridge, several MSE retaining walls, and overhead signs. The exploration included SPT <br />borings, CPT soundings, Ground Penetrating Radar (GPR), and pavement cores. <br />February, 2026��AET <br />