My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/24/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:21:20 PM
Creation date
3/6/2026 9:40:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Experience <br />109th Ave Improvements, Brooklyn Park & Champlin, MN <br />2023 <br />Lead geotechnical engineer for the reconstruction and widening of 109th Avenue to include an additional lane and <br />turn lanes. The exploration consisted of standard penetration test (SPT) borings, flight auger borings, pavement <br />cores, and laboratory testing. Bituminous pavement designs were provided for the roadways; and concrete and <br />bituminous pavement designs were provided for a roundabout. The project also included a stormwater BMP area <br />in which a hydraulic conductivity (permeability) test was performed to help infiltration design. <br />2024 Street Reconstruction, New Brighton, MN <br />2023 <br />Lead geotechnical engineer for the reconstruction of multiple bituminous -surfaced streets and utilities, including <br />deeper storm sewer installations. The exploration consisted of SPT borings, pavement cores, sieve analyses, and <br />moisture testing. Recommendations included bituminous section design and utility support. <br />Dale Street Mill and Overlay, Saint Paul, MN 2023 <br />Lead geotechnical engineer for the pavement rehabilitation of a roadway consisting of deteriorated bituminous <br />and underlying concrete pavement intended for a 4-2 lane conversion. The exploration consisted of a GPR survey <br />and pavement cores. The geotechnical report included recommendations for mill and overlay design and GPR <br />analysis. <br />Tonka-Woodcroft & Minnetonka Blvd Trail Improvements, Minnetonka, MN Year <br />Lead geotechnical engineer for the reconstruction and a new bituminous trail through a narrow corridor adjacent to <br />Frederick Lake. Included a cast -in -place retaining wall supported by pipe piles due to swamp deposits and soft <br />soils, and 50+ feet directional drilling for stormwater utilities. Provided design parameters for retaining walls, <br />pavement sections, utility support, and stormwater infiltration. Also served as project manager for compaction, <br />concrete, bituminous, and infiltration testing (using MPD infiltrometer), as well as subgrade evaluations and pile <br />driving analyzer (PDA) reviews. <br />February, 2026��AET <br />
The URL can be used to link to this page
Your browser does not support the video tag.