My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/24/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:21:20 PM
Creation date
3/6/2026 9:40:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
401 Ezs <br />www.ae2s.com <br />034 Specialty Urethane Painting $50,440.88 <br />Meeting Modifications <br />035A Submittal Dedication Plaque $1,374.52 <br />145 Modifications <br />Manhole Install and Manhole No. 1-$19,917.35 <br />No. 1 Dewatering <br />036 RFI 056 EIFs Base Flashing $2,131.50 <br />037 Field Filter Masonry Wall $10,596.47 <br />Directed Cut <br />Water Wick <br />038 Connection to Lower $2,408.60 <br />Level <br />Field Order RWL Route <br />No. 17 Modification <br />Field <br />Directed <br />039 <br />040 <br />Field <br />Directed <br />041 RFP 019 <br />Transformer Bollards <br />Plate Settler Flow <br />Meter Locations <br />044 RFI 066 Generator Panel Feed <br />045 <br />Submittal <br />178 <br />046 RFP 020 <br />Added Beam <br />Stiffeners <br />Explosion Proof EF <br />Room 109 <br />047 RFI 073 Air Flow Meter <br />048 <br />049 RFP 022 <br />050 RFP 021 <br />053 <br />054 <br />057 <br />058 <br />Field Remote Actuator <br />Directed Hand Stations <br />Valve Actuator <br />Voltage <br />Sludge Line <br />Additional Drop Pipe <br />Field Chlorine Tank <br />Directed Lifting Bar <br />Field Closet 104 Ceiling <br />Directed Change <br />Field Air Flow Meter <br />Order 33 Modification <br />Decorative Fence <br />Modifications <br />RFI 080 <br />$3,437.04 <br />$4,324.89 <br />$6,921.19 <br />$3,036.94 <br />$5,418.03 <br />$16,880.50 <br />$7,717.05 <br />$25,200.00 <br />$33,887.52 <br />$9,266.22 <br />$2,869.99 <br />-$624.33 <br />$1,711.68 <br />$671.42 <br />Note: Any extension delays will be approved as a separate Change Order and will not be <br />Contingency Expense. <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 12 <br />Approved — <br />Constructing Contingency Expense 12 <br />Approved — <br />Constructing Contingency Expense 11 <br />Approved — <br />Constructing Contingency Expense 11 <br />Approved — <br />Constructing Contingency Expense 11 <br />Approved — <br />Constructing Contingency Expense 11 <br />Approved — <br />Constructing Contingency Expense 12 <br />Approved — <br />Constructing Contingency Expense 12 <br />Pending — <br />Constructing Contingency Expense 13 <br />Pending — <br />Constructing Contingency Expense 13 <br />included in this Construction <br />Proposal No. 057 — Air Flow Meter Modifications: <br />Included with the air was blower system for supplying backwash air to each of the six (6) gravity filters is <br />a air flow meter. After starting up the blower and programming the meter, it was discovered that the current <br />location prohibits ease of access for maintenance and does not provide adequate lay length for accurate <br />flow reads. The proposal includes the labor and materials for moving and installing the flow meter in a <br />different location. <br />Proposal No. 058 — Decorative Fence Modifications: <br />The site grading plan for the west side of the reservoir is sloped to cover a majority of the reservoir west <br />facing wall. This creates a steep grade change from the driveway to the reservoir. After discussing with the <br />Owner, it was decided to route the fencing to the north of this slope to keep the fence as level as possible. <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.