Laserfiche WebLink
Erickson Electric <br />Material Cost <br />Material $ 199.30 <br />Tax 7.625% $ 15.20 <br />Material MU 10% $ 19.93 <br />Permit $ <br />Labor Rate/hr Hours <br />PM/Estimator $190 1 $ 190.00 <br />Wireman $180 2.32 $ 417.60 <br />Overtime 1-1/2 $270 0 $ <br />Overtime double time $360 0 $ <br />Labor MU 10% $ 60.76 <br />Subcontractor <br />Mat. $ <br />labor $ <br />Markup @ 5% $ <br />Subtotal $ 902.79 <br />Bond $ <br />Total cost for this chano $ 902.79 <br />