Laserfiche WebLink
Ads <br />To: <br />Title: <br />Company: <br />Address: <br />Field Order/ Supplemental Instruction <br />Kevin Vranicar <br />Project Manager <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />From: <br />Title: <br />AE2S No.: <br />Field Order No.: <br />Date: <br />FO-033 <br />1/15/2026 <br />Abby Bowman <br />Resident Project Representative <br />P05434-2020-002 <br />You are hereby directed to execute this Field Order/ Supplemental Instruction that interprets or provides for <br />minor revisions to the Contract Documents without changes to the Contract Price or Time. <br />Referenced Document(s): <br />❑X <br />Description of Interpretation or Change: <br />Specification Section(s): <br />Drawing(s): <br />Adjust air flow meter location to the longer lay length pipe in the blower room. Swap the pressure gauge and <br />flow meter locations. See sketch attached. <br />Attachments: <br />X❑ Attachments (iistj: <br />P124, <br />Supplemental Instructions <br />Copies: <br />Signature: <br />Abby Bowman <br />❑ Posted on Newforma <br />❑ Field Office, Ryan Hanson, AE2S <br />® AE2S File <br />❑ Other: <br />Page 1 <br />