My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/24/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:21:20 PM
Creation date
3/6/2026 9:40:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ITEM NOTES. <br />1. REMOVAL LIMITS SHALL BE MARKED IN THE FIELD BY CITY 5 <br />2. EV TO CV CONVERSION FACTOR = 1.25. <br />3. EV TO CV CONVERSION FACTOR = 1.30. <br />4. ESTIMATED QUANTITY BASED ON APPLICATION RATE OF 0.07 GAL/SY. <br />Y BASED ON APPLICATION RATE OF 113 LB/SY-IN <br />5 ESTIMATEDQ <br />.SALVAGED MAILBOX POSTS TO BE PLACED TO ORIGINAL LOCATION OR AS DIRECTED BY THE ENGINEER. <br />2.LINEAR FOOT MEASUREMENT DOES NOT INCLUDE FLARED END SECTIONS. <br />13 COORDINATE WITH USPS ON PREFERRED LOCATIONS OF TEMPORARY MAILBOX CLUSTERS. <br />XCAVATION INCLUDES TOPSOIL MATERIAL REMOVED IN AREAS DISTURBED OUTSIDE OF ROADWAYS. <br />} <br />15.MOW PERMANENTLY SEEDED AREAS IN EARLY JUNE, MID-JULY, AND LATE AUGUST UNLESS OTHERWISE DIRECTED BY ENGINEE <br />18.THE EACH QUANTITY CONSIST OF AN APPROXIMATION OF THE AMOUNT OF LOTS THAT MAY HAVE IRRIGATION THAT COULD BE DAMAGED ACROSS THE PROJECT. <br />CITY OF RAMSEY PUBLIC WORKS DEPARTMENT <br />7. FLARED END STRUCTURE INVERTS ARE LOCATED AT THE END OF TH <br />STATEMENT OF ESTIMATED QUANTITIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.