My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/24/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:21:20 PM
Creation date
3/6/2026 9:40:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />January 29, 2026 <br />Joe Feriancek, P.E. <br />Assistant City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services, City of Ramsey — Section 01 Unplatted Street <br />Reconstructions (City Project No. 26-07) <br />Dear Mr. Feriancek: <br />We appreciate the opportunity to assist the City of Ramsey with construction staking for the above - <br />referenced project. <br />SCOPE OF WORK <br />Bolton & Menk will complete the construction staking and as -built survey for this project, which <br />generally includes: <br />• 0.20 Acres of Clearing and Grubbing, <br />• 75 RDST of Subgrade Bluetops, <br />• 75 RDST of Base Course Blue Tops, <br />• Removals, <br />• 26 Flared End Sections, <br />• 4 Storm Sewer Structures, <br />• 542 LF Storm Sewer / Culverts, <br />• 4 Concrete Flumes <br />• 50 Driveway Tie-ins, <br />• 1,910 LF of Concrete Curb and Gutter, <br />• 3,560 LF of Sediment Control Logs, <br />• 7,870 LF of Silt Fence, <br />• Salvaging 46 Mail Box Supports, and <br />• Miscellaneous other items. <br />We will also complete the As -Built Survey for Record Drawing creation. <br />ASSUMPTIONS <br />We have made the following assumptions in preparing this proposal: <br />• No allowance is included for staking of right-of-way. <br />• Replacing damaged or removed stakes is not included in our base fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.