Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />02/24/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />7. 3. <br />Title: <br />Adopt Resolution #26-050 Accepting Bids and Awarding Contract for MSA Bunker Lake Boulevard <br />Reconstruction, Improvement Project #26-01 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-050 accepting bids and awarding a contract to North Valley, <br />Inc. for the total amount of $1,066,382.87 for MSA Bunker Lake Boulevard Reconstruction, Improvement <br />Project #26-01. Also, to adopt Resolution #26-061 approving the terms of up to a $2,000,000 interfund loan in <br />connection with infrastructure improvements — Bunker Lake Boulevard Reconstruction in connection with Tax <br />Increment Financing District No.18. <br />Background: <br />The 2026 — 2035 Capital Improvement Program (CIP) identifies Bunker Lake Boulevard between Armstrong <br />Boulevard and 600 feet west of Jackal Street (the tie-in point from the 2018 project) for reconstruction in 2026. A <br />street segment summary is attached to this case. <br />Project History <br />• April 22, 2025, the Ramsey City Council adopted Resolution #25-081, ordering plans and specifications <br />and awarding engineering design services to Bolton & Menk for said improvements. <br />• December 16, 2025, the Ramsey Public Works Committee recommended City Council approve plans and <br />specifications and authorize advertisement for bids for said improvements. <br />• January 13, 2026, the Ramsey City Council adopted Resolution #26-008 approving final plans and <br />specifications and authorizing advertisement of bids for said improvements. <br />• January 27, 2026, the Ramsey City Council adopted Resolution #26-027 amending the design services <br />proposal from Bolton & Menk for said improvements. <br />• February 12, 2026 Bolton & Menk publicly opened bids for said improvements. A contract award <br />recommendation is attached to this case. <br />Project Scope <br />This project proposes to reconstruct Bunker Lake Boulevard in a similar fashion to the previously reconstructed <br />Bunker Lake Boulevard and Puma Street segments. The existing street is 28-feet wide with concrete curb and <br />gutter on the north side (westbound) and rural section including a drainage swale on the south side (eastbound). <br />The project proposes expanding the pavement to the south, to create a shared center turn lane. The new eastbound <br />lane is proposed to include concrete curb and gutter, the existing drainage swale is proposed to be re -graded. <br />Storm sewer inlets will be placed in the eastbound curb line, tying into existing stubs. <br />Bunker Lake Boulevard is an MSA street, which will require it to be built to MSA standards, including a 10-ton <br />pavement strength design. This will be achieved by placing 4.5-inches of new bituminous over a minimum of 6.5" <br />aggregate base made up of recycled reclamation material. Bituminous trail exists on the north side of Bunker <br />Lake Boulevard, the project does not propose to improve the existing trail. The western half of this segment has <br />been developed with commercial/industrial users. The eastern half is generally not developed, a gas station is <br />currently being built at the southwest corner of Bunker Lake Boulevard and Armstrong Boulevard. Coordination <br />with proposed developments has been occurring during the project design. The project totals 0.47 miles in length. <br />