Laserfiche WebLink
Timeframe: <br />Staff estimates up to 10 minutes will be required to present this case and answer questions. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #26-050 accepting bids and awarding a contract to North Valley, Inc. <br />for the total amount of $1,066,382.87 for MSA Bunker Lake Boulevard Reconstruction, Improvement Project <br />#26-01. Adopt Resolution #26-061 approving the terms of up to a $2,000,000 interfund loan in connection with <br />infrastructure improvements — Bunker Lake Boulevard Reconstruction in connection with Tax Increment <br />Financing District No.18. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Public Improvement Revolving Funds (developer fees), <br />Tax Increment #18, Municipal State Aid Funds, Water Utility Funds and Storm Water Utility Funds. <br />The Tax Increment #18 funding is an estimate based on availability at this time. Resolution #26-061 is attached to <br />this case, which proposes to set up an interfund loan, allowing the city to reimburse the qualified costs back to <br />itself from the TIF District in the future. Fifty -six -percent (56%) of the total project costs qualify for TIF #18 <br />funding. <br />On February 12, 2026 a total of eight (8) bids were received, opened, and tabulated, and the following bids were <br />found to comply with the advertisement for bids. <br />Contractor <br />North Valley, Inc. <br />Forest Lake Contracting, Inc. <br />Valley Paving, Inc. <br />Douglas -Kerr Underground, L.L.C. <br />New Look Contracting, Inc. <br />Park Construction Company <br />Northwest <br />Dresel Contracting, Inc. <br />Engineer's Estimate <br />Total Bid <br />$1,066,382.87 <br />$1,100,364.50 <br />$1,119,770.78 <br />$1,122,881.06 <br />$1,137,841.75 <br />$1,165,297.40 <br />$1,274,866.66 <br />$1,434,658.03 <br />$1, 208, 370.00 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $1,066,382.87 for the total bid of said <br />improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest <br />responsible bidder. Adding indirect costs in the amount of 23-percent brings the total project costs to <br />$1,311,650.93. <br />The bid is 12-percent lower than the engineer's estimate, primarily due to lower than anticipated excavation and <br />earthwork prices. <br />Funding Source Breakdown (Project Costs including 23-percent Indirect Costs): <br />Public Improvement Revolving Funds $391,000.00 <br />Tax Increment #18 Funds* $386,750.00 <br />Municipal State Aid Funds $252,237.86 <br />Water Utility Funds $106,716.43 <br />Storm Water Utility Funds $174,946.64 <br />Project Total $1,311,650.93 <br />*$386,750.00 of TIF #18 funds are anticipated to be available by the end of 2026. Fifty-six percent (56%) of the <br />total project costs qualify for TIF #18 funding. Based on the bid prices, this can be up to $734,524.52. <br />