Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />January 29, 2026 <br />Joe Feriancek, P.E. <br />Assistant City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />RE: Proposal for Construction Related Services — Bunker Lake Boulevard — IP 26-01 <br />Dear Mr. Feriancek: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to present this scope of services for the Bunker Lake Boulevard <br />Improvements. Our scope and fees were prepared based on our understanding of the project and our <br />previous experience in assisting the City of Ramsey with similar project types. Our proposed services will <br />be as described below: <br />Contract Preparation — Assist with Notice of Award, Contracts, and Notice to Proceed. Prepare sets of <br />contract documents (plans and specifications) for City and Contractor. <br />Pre -Construction Conference — Facilitate the Pre -Construction Conference and address questions that <br />may arise related to project design or construction staking. Prepare Agenda and Minutes. <br />Shop Drawing / Submittal Review — Review submittals for key project components. <br />Construction Staking — Includes the following: <br />• Staking Calculations and Preparation of Data, <br />• Establishing Survey Control, <br />• Staking of Erosion Control, ROW, and Removals, <br />• Ditch Grading, <br />• Culverts and Storm Sewer, <br />• Sidewalks, <br />• Bluetops, and <br />• Striping. <br />Pay Application Assistance — Work with City and Contractor to complete payment documents. <br />As -Built Survey and Record Drawings — Survey key project components after completion of construction <br />and prepare of Record Drawings. <br />Construction Revisions / Plan Updates — To be performed as needed during construction. We have <br />assumed a total of 24 hours for this task. <br />