My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 03/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:37:32 PM
Creation date
3/6/2026 10:49:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvement plan estimate reflects additional soil correction work. Substantial completion is <br />scheduled for August 28, with final cleanup by October 2. <br />Assistant City Engineer Feriancek presented a resolution to award the contract and indicated he <br />was available for questions. <br />Councilmember Stewart asked whether North Valley has the staffing capacity and resources to <br />complete both neighborhood reconstruction projects concurrently while meeting the same <br />scheduled completion date. <br />Assistant City Engineer Feriancek reported that North Valley was also the low bidder on the third <br />project. He stated that he has spoken with the contractor and that North Valley is one of the larger <br />contractors in the area, typically completing multiple projects for the city each year. He noted that <br />these projects represent approximately 5 percent of the contractor's annual workload, indicating <br />that the company has sufficient capacity to complete the work as scheduled. <br />Motion by Councilmember Peters, seconded by Councilmember Stewart, to adopt Resolution #26- <br />049 accepting bids and awarding a contract to North Valley, Inc. for the total amount of <br />$1,189,848.87 for Section 01 Unplatted Street Reconstruction, Improvement Project #26-07. <br />Motion carried. Voting Yes: Mayor Heineman, Councilmembers Buscher, Peters, Riley, and <br />Stewart. Voting No: None. Absent: Councilmembers Olson and Specht. <br />7.03: Adopt Resolution #26-050 Accepting Bids and Awarding Contract for MSA Bunker <br />Lake Boulevard Reconstruction, Improvement Project #26-01 <br />Assistant City Engineer Feriancek presented the Bunker Lake Boulevard reconstruction project, <br />extending from Armstrong Boulevard to approximately 600 feet west of Jackal Street. The project <br />covers just under half a mile and includes an urban section on the north side and a rural section on <br />the south side. The roadway was originally partially constructed in 2011 with plans for a four -lane <br />configuration, and in 2018, the western half was built as a three -lane road with a shared center turn <br />lane. The current project will complete the roadway to match that three -lane configuration. <br />Assistant City Engineer Feriancek explained that the project was advanced to take advantage of <br />Tax Increment Financing District 18 funds associated with nearby development. Because the <br />roadway is a municipal state aid route, it required approval through the Municipal State Aid <br />process and coordination with Anoka County for modifications at the Armstrong Boulevard signal. <br />Improvements include installing curb and gutter on the south side, extending storm sewer <br />infrastructure to new catch basins, regrading the existing swale, modifying the concrete median, <br />adjusting the signalized intersection to allow for two eastbound right -turn lanes in the future, and <br />relocating fire hydrants to align with the new curb configuration. The existing sanitary sewer and <br />water main infrastructure are relatively new and will not require replacement. <br />Assistant City Engineer Feriancek stated the project will require a full closure of Bunker Lake <br />Boulevard between Armstrong and Jackal, with a two-mile detour route established and <br />communicated to property owners. Bids were opened on February 12, with eight bids received and <br />City Council /February 25, 2026 <br />Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.