Laserfiche WebLink
City Project No. 26-05 - Construction Staking <br />January 29, 2026 <br />Page 2 of 2 <br />• No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are <br />included in our hourly rates. <br />• Additional services, if required, will be performed at the rates presented in the Proposed Fees <br />section of this proposal. <br />PROPOSED FEES <br />Bolton & Menk proposes to perform the staking based on a not -to -exceed amount, based on the rates <br />presented in the following table: <br />Task and Personnel <br />Task 1: Construction Staking <br />Licensed Surveyor <br />Survey Technician <br />Survey Crew <br />Hours <br />12.0 <br />19.0 <br />170.0 <br />Rate/Hour Total <br />$215.00 <br />$166.00 <br />$203.00 <br />$ 2,580.00 <br />$ 3,154.00 <br />$ 34,510.00 <br />Subtotals 201.0 $ 40,244.00 <br />Task 2: Asbuilt Survey <br />Licensed Surveyor 2.0 $215.00 $ 430.00 <br />Survey Technician 0.0 $166.00 $ 0.00 <br />Survey Crew 12.0 $203.00 $ 2,436.00 <br />Subtotals 14.0 $ 2,866.00 <br />Grand Totals 215.0 <br />$ 43,110.00 <br />SCHEDULE <br />Due to our proximity to the site, we expect to be able to respond quickly to all construction staking <br />requests however 48-hour notice is required to allow us to efficiently schedule survey crews. <br />If there are any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />rboton & Men;; Is an equal opportunity emptoyc <br />