Based on GPR data and as -built information a 2-inch mill and overlay are proposed on all streets; Evergreen <br />Point Townhomes will require a 1-inch mill with 2-inch overlay. <br />Alpine Woods <br />The original construction of Uranium Street included a temporary bituminous turnaround above the curb line, <br />mimicking a cul-de-sac turnaround. This was to set up potential extension of Uranium Street to the north. A house <br />was constructed between 2011 and 2014 immediately north of the Uranium Street right of way, make future <br />extension of Uranium Street not practical. This project includes moving the curb line to the edge of the cul-de-sac, <br />converting this from a temporary improvement to a permanent one. This will improve public works staff's ability <br />to maintain this cul-de-sac, including making snow plowing less difficult. <br />Preliminary Schedule Remaining <br />• Council approves plans and specifications / authorizes ad for bids <br />o April 14, 2026 <br />• Bid Opening <br />oWeekofMay 11th <br />• Council awards contract to the Lowest Responsible Bidder <br />o May 26, 2026 <br />• Contractor Begins Construction <br />o Early Summer 2026 <br />• Contractor Substantially Completes Construction <br />o New bituminous in -place <br />o July 31, 2026 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o August 28, 2026 <br />Notification: <br />If Council approves plans and specifications and authorizes advertising for bids, bids will be advertised on <br />Friday, April 17, and again on Friday, April 24, 2026, in the City's official newspaper, the Anoka Union Herald. <br />Plans are also advertised on the QuestCDN website, which directly notifies contractors interested in bidding these <br />types of projects. <br />Additionally, letters will be mailed to property owners with updates on the project status. Engineering staff <br />maintains City Improvement webpages with the most current project information. This can be found on the city <br />website, Engineering Department page. <br />Time Frame/Observations/Alternatives: <br />Alternatives: <br />Motion to adopt Resolution #26-091 approving plans and specifications and authorizing advertisement for bids for <br />2026 Neighborhood Pavement Overlay Improvements, Improvement Project #26-08. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Storrn Water Utility <br />Funds. Estimated costs below include 14-percent indirect costs. The final project costs may change from the <br />estimate depending upon bid prices and actual construction quantities. Below is Bolton & Menk's Engineer's <br />Estimate based upon final plans. <br />• Pavement Management Funds $615,195 <br />• Storm Sewer Utility Funds $16,000 <br />• Project Total $631,195 <br />