Laserfiche WebLink
CASE#1 <br />PARK DEDICATION FOR PINE PRAIRIE <br />By: Leonard Linton, Civil Engineer II <br />Background: <br />This project was reviewed at the June 8, 2006 meeting under the name GAD'S Prairie. The <br />project did not go forward and has been sold to Tri-Cor Development, LLC. The project has <br />been renamed Pine Prairie and they are proposing 9 units instead of 7 units. The site is 1.7 <br />acres and zoned R-2 Medium Density. They are proposing a public street with a temporary <br />cul-de-sac that can be converted to a through street. <br />The development is in the Sunfish Lake Recreation District. <br />Observation: <br />The previous project proposed 71ots. The commission action was to accept park and trail <br />dedication in cash along with constructing the trail parallel to Nowthen Boulevard. This project <br />is proposing 9 lots. The plans show a 24 foot wide public street with a reduced width right of <br />way. The plans are showing a trail along Nowthen Boulevard. The trail will address the policy <br />requirement for a sidewalk through all townhouse developments, the trail generally parallels <br />the proposed public street and the reduced right-of--way does not provide room for a sidewalk. <br />The trail must be constructed outside the county right-of--way and must connect to the existing <br />trail on the south east corner of the site. The trail will terminate at the north edge of the <br />project. Generally trails must be extended to the nearest street; however, in this case the <br />properties between this site and the nearest street could be developed in the near future and it is <br />preferable that the trail extension be constructed outside the county right-of--way. The <br />planning commission submittal is attached with additional information. <br />The project was reviewed by the Planning Commission at the February 1 meeting. They <br />recommended denial of the preliminary plat. The project will be forwarded to the City <br />Council for recommendation. <br />Staff Recommendation: <br />Staff recommends park.dedication for Pine Prairie in cash $22,275 (91ots @ $2.,475).,Trail- <br />fees will be paid in cash in the amount of $5,400 (9 lots @ $600.00). The trail segement for <br />the project must be constructed outside of the County right-of--way.. <br />