My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 02/08/2007
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2007
>
Agenda - Parks and Recreation Commission - 02/08/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:39:15 PM
Creation date
2/5/2007 9:13:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
02/08/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE#1 <br />PARK DEDICATION FOR PINE PRAIRIE <br />By: Leonard Linton, Civil Engineer II <br />Background: <br />This project was reviewed at the June 8, 2006 meeting under the name GAD'S Prairie. The <br />project did not go forward and has been sold to Tri-Cor Development, LLC. The project has <br />been renamed Pine Prairie and they are proposing 9 units instead of 7 units. The site is 1.7 <br />acres and zoned R-2 Medium Density. They are proposing a public street with a temporary <br />cul-de-sac that can be converted to a through street. <br />The development is in the Sunfish Lake Recreation District. <br />Observation: <br />The previous project proposed 71ots. The commission action was to accept park and trail <br />dedication in cash along with constructing the trail parallel to Nowthen Boulevard. This project <br />is proposing 9 lots. The plans show a 24 foot wide public street with a reduced width right of <br />way. The plans are showing a trail along Nowthen Boulevard. The trail will address the policy <br />requirement for a sidewalk through all townhouse developments, the trail generally parallels <br />the proposed public street and the reduced right-of--way does not provide room for a sidewalk. <br />The trail must be constructed outside the county right-of--way and must connect to the existing <br />trail on the south east corner of the site. The trail will terminate at the north edge of the <br />project. Generally trails must be extended to the nearest street; however, in this case the <br />properties between this site and the nearest street could be developed in the near future and it is <br />preferable that the trail extension be constructed outside the county right-of--way. The <br />planning commission submittal is attached with additional information. <br />The project was reviewed by the Planning Commission at the February 1 meeting. They <br />recommended denial of the preliminary plat. The project will be forwarded to the City <br />Council for recommendation. <br />Staff Recommendation: <br />Staff recommends park.dedication for Pine Prairie in cash $22,275 (91ots @ $2.,475).,Trail- <br />fees will be paid in cash in the amount of $5,400 (9 lots @ $600.00). The trail segement for <br />the project must be constructed outside of the County right-of--way.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.