<br />INSPECTION AND ACCEPTANCE
<br />TURF RESTORATION NOTES
<br />WET DITCH AND MESIC SEED REQUIRED MAINTENANCE - 3 YEARS
<br />C:\Users\mflicker\DC\ACCDocs\Stantec Consulting1190300586_Ace _Solid _Waste -Natural _Gas\Project Files\5_DESIGN1a_CAD14_PLANSHEETS\L-101 LANDSCAPE PLAN 00586.dwg 4/9/2026 FLICKER, MARK
<br />1. LANDSCAPE WORK WILL BE INSPECTED FOR ACCEPTANCE IN PARTS AGREEABLE TO THE OWNER,
<br />PROVIDED WORK OFFERED FOR INSPECTION IS COMPLETE, INCLUDING MAINTENANCE, FOR THE
<br />PORTION IN QUESTION.
<br />2. AT THE CONCLUSION OF THE ESTABLISHMENT PERIOD, WHICH WILL BE ONE YEAR FOLLOWING INITIAL
<br />INSTALLATION A FINAL INSPECTION OF PLANTING WILL BE MADE TO DETERMINE THE CONDITIONS OF
<br />AREAS SPECIFIED FOR LANDSCAPING.
<br />3. WHEN INSPECTED LANDSCAPE WORK DOES NOT COMPLY WITH REQUIREMENTS, REPLACE REJECTED
<br />WORK AND CONTINUE SPECIFIED MAINTENANCE UNTIL RE -INSPECTED BY OWNER AND FOUND TO BE
<br />ACCEPTABLE. REMOVE REJECTED PLANTS AND MATERIALS FROM SITE.
<br />PLANTING NOTES
<br />1. UPON APPROVAL OF STAKING LOCATIONS CONTRACTOR SHALL EXCAVATE PLANTING HOLES CENTERED
<br />AT STAKED LOCATIONS.
<br />2. DIG HOLES AS DETAILED AND TO A DIAMETER A MINIMUM OF TWO TIMES THE DIAMETER OF THE ROOT
<br />BALL OR CONTAINER.
<br />3. REMOVE STICKS, RUBBISH, FOREIGN MATERIALS AND UNDESIRABLE PLANTS AND THEIR ROOTS.
<br />REMOVE STONES MEASURING OVER 1-1/2 INCHES IN ANY DIMENSIONS.
<br />4. SET BALLED AND BURLAPPED (B&B) STOCK ON LAYER OF COMPACTED PLANTING SOIL MIXTURE, PLUMB
<br />AND IN CENTER OF PIT OR TRENCH WITH TOP OF ALL AT SAME ELEVATION AS ADJACENT FINISHED
<br />LANDSCAPE GRADES.
<br />5. ROOT FLARE OF THE TREE MUST BE ABOVE FINISHED GRADE.
<br />6. CUT ALL CORDS AND TWIN AND REMOVE WIRE BASKET AND BURLAP FROM TOP AND SIDES OF BALLS;
<br />RETAIN BURLAP ON BOTTOMS.
<br />7. WHEN SET, PLACE ADDITIONAL PLANTING SOIL BACKFILL AROUND BASE AND SIDES OF BALL, AND WORK
<br />EACH LAYER TO SETTLE BACKFILL AND ELIMINATE VOIDS AND AIR POCKETS.
<br />8. WHEN EXCAVATION IS APPROXIMATELY 2/3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER
<br />OF BACKFILL.
<br />9. REPEAT WATERING UNTIL NO MORE IS ABSORBED. WATER AGAIN AFTER PLACING FINAL LAYER OF
<br />BACKFILL.
<br />10. FOR CONTAINER GROWN STOCK, SAME AS FOR BALLED AND BURLAPPED STOCK, EXCEPT CUT
<br />CONTAINERS ON SIDES INTO QUARTERS WITH SHEAR. REMOVE CONTAINER BEFORE SETTING PLANT
<br />SO AS NOT TO DAMAGE ROOT BALLS.
<br />11. WATER EACH PLANT WITHIN 2 HOURS OF PLANTING.
<br />12. ALL PLANTINGS TO BE MULCHED UNLESS OTHERWISE NOTED ON THE PLAN.
<br />13. PLACE 3-INCH THICKNESS OF MULCH AROUND TREES AND SHRUBS WITHIN A PERIOD OF 48 HOURS
<br />AFTER THE SECOND WATERING. DO NOT PLACE MULCH IN DIRECT CONTACT WITH TRUNKS OR STEMS.
<br />14. PLACE 3-INCH THICKNESS LOCALLY AVAILABLE DOUBLE SHRED HARD WOOD MULCH AROUND ALL
<br />TREES OUTSIDE OF PLANT BEDS.
<br />MAINTENANCE NOTES
<br />1. WHEN INSPECTED LANDSCAPE WORK DOES NOT COMPLY WITH REQUIREMENTS, REPLACE REJECTED
<br />WORK AND CONTINUE SPECIFIED MAINTENANCE UNTIL RE -INSPECTED BY OWNER AND FOUND TO BE
<br />ACCEPTABLE. REMOVE REJECTED PLANTS AND MATERIALS FROM SITE.
<br />2. BEGIN MAINTENANCE IMMEDIATELY AFTER PLANTING.
<br />3. MAINTAIN TREES AND BUSHES INCLUDING WATERING FOR ONE YEAR AFTER ACCEPTANCE BY OWNER.
<br />IT IS CONTRACTORS RESPONSIBILITY FOR COORDINATE WATERING.
<br />4. TRIM, PRUNE, REMOVE CLIPPINGS AND DEAD OR BROKEN BRANCHES, AND TREAT PRUNED AREAS AND
<br />OTHER WOUNDS.
<br />5. IT IS THE CONTRACTOR'S OPTION WHETHER OR NOT TO STAKE TREES. THE CONTRACTOR IS
<br />RESPONSIBLE FOR MAINTAINING TREES IN AN UPRIGHT POSITION THROUGHOUT THE ONE-YEAR
<br />GUARANTEE PERIOD.
<br />GUARANTEE AND REPLACEMENTS
<br />1. PLANT MATERIAL SHALL BE GUARANTEED FOR TWO FULL YEARS AFTER OWNER ACCEPTANCE AND
<br />SHALL BE ALIVE AND IN SATISFACTORY CONDITION AT THE END OF THE GUARANTEE PERIOD. SUCH
<br />GUARANTEE EXCLUDES VANDALISM.
<br />2. AT THE END OF THE TWO-YEAR GUARANTEE PERIOD, INSPECTION WILL BE MADE BY THE OWNER UPON
<br />WRITTEN NOTICE BY THE CONTRACTOR AT LEAST FIVE DAYS BEFORE THE ANTICIPATED DATE. ANY
<br />PLANT MATERIAL REQUIRED UNDER THE CONTRACT THAT IS DEAD OR NOT IN SATISFACTORY
<br />CONDITION, AS DETERMINED BY THE OWNER, SHALL BE REMOVED FROM THE SITE, AND SHALL BE
<br />REPLACED AS SOON AS CONDITIONS PERMIT DURING THE NORMAL PLANTING SEASONS.
<br />3. THE OPINION OF THE OWNER SHALL GOVERN IN ANY AND ALL DISPUTES BY THE CONTRACTOR
<br />REGARDING THE CONDITION AND DISPOSITION OF UNSATISFACTORY MAINTENANCE PROCEDURES OR
<br />REJECTED PLANTS.
<br />4. ALL REPLACEMENTS SHALL BE PLANT MATERIAL OF THE SAME KIND AND SIZE AS SPECIFIED IN THE
<br />PLANT LIST. REPLACEMENT COSTS SHALL BE BORNE BY THE CONTRACTOR.
<br />5. REPLACEMENT PLANTINGS REQUIRED AT THE END OF THE GUARANTEE PERIOD ARE NOT TO BE
<br />GUARANTEED. THE PLANT MATERIAL IS SUBJECT TO INSPECTION AND REJECTION BY THE OWNER
<br />BEFORE AND AFTER PLANTING.
<br />PROTECTION OF EXISTING CONDITIONS
<br />1. BECOME ACQUAINTED WITH ALL SITE CONDITIONS. LOCATE EXISTING UTILITIES AND EQUIPMENT TO
<br />REMAIN. SHOULD UTILITIES OR OTHER WORK NOT SHOWN ON THE DRAWINGS BE FOUND DURING
<br />EXCAVATIONS, PROMPTLY NOTIFY ENGINEER. FAILURE TO DO SO WILL MAKE CONTRACTOR LIABLE FOR
<br />ANY AND ALL DAMAGE ARISING FROM OPERATIONS SUBSEQUENT TO DISCOVERY OF SUCH UTILITIES NOT
<br />SHOWN ON DRAWINGS.
<br />2. TAKE NECESSARY PRECAUTIONS TO PROTECT EXISTING SITE CONDITIONS. REPAIR ANY DAMAGED ITEM
<br />TO ITS ORIGINAL CONDITION OR FURNISH AND INSTALL EQUIVALENT REPLACEMENT AT NO ADDITIONAL
<br />COST TO OWNER.
<br />WARNING:
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL
<br />COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.
<br />THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS (EXCLUDING
<br />HOLIDAYS AND WEEKENDS) IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS,
<br />PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR
<br />REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.
<br />CALL BEFORE YOU DIG
<br />GOPHER STATE ONE CALL
<br />TWIN CITY AREA: 651-454-0002
<br />TOLL FREE: 1-800-252-1166
<br />1 THE ESTABLISHMENT PERIOD FOR SEED SHALL BEGIN IMMEDIATELY AFTER INSTALLATION, WITH THE
<br />APPROVAL OF THE OWNER, AND CONTINUE UNTIL THE DATE THAT THE OWNER PERFORMS A FINAL
<br />INSPECTION.
<br />2. TURF SOD COMPOSITION SHALL BE OF A LOW MAINTENANCE VARIETY. SUBMIT SOD CUT SHEET FOR
<br />OWNER REVIEW AND APPROVAL.
<br />3. MESIC SEED MIX SHALL BE MID DIVERSITY MESIC TO DRY BUFFER SOUTH & WEST BWSR #32-231,
<br />INSTALLED AT A RATE OF 37.50 LB/AC. CONTRACTOR SHALL ADDITIONALLY INSTALL OATS COVER CROP
<br />MNDOT #21-11 AT A RATE OF 20 LB/AC. COVER SEEDED AREAS WITH MCIA CERTIFIED WEED -FREE STRAW
<br />(MNDOT TYPE 3) AT 2 TONS PER ACRE. ANCHOR WITH CORNSTARCH STAKES EVERY 3'. SUBMIT SEED
<br />MIXTURE FOR APPROVAL.
<br />4. WET DITCH SEED MIX SHALL BE MNDOT #33-261, INSTALLED AT A RATE OF 20 LB/AC. CONTRACTOR SHALL
<br />ADDITIONALLY INSTALL OATS COVER CROP MNDOT #21-11 AT A RATE OF 20 LB/AC. COVER SEEDED AREAS
<br />WITH MCIA CERTIFIED WEED -FREE STRAW (MNDOT TYPE 3) AT 2 TONS PER ACRE. ANCHOR WITH
<br />CORNSTARCH STAKES EVERY 3'. SUBMIT SEED MIXTURE FOR APPROVAL.
<br />5. SEED SHALL BE INSTALLED WITH A BROADCAST SPREADER INTO CONTRACTOR PREPARED SEED BED.
<br />DRAG WITH A LIGHT RAKE TO ENSURE SOIL CONTACT.
<br />6. FERTILIZER SHALL HAVE A FORMULA (N-P-K) AS DETERMINED BY THE RESULTS OF A SOIL TEST.
<br />CONTRACTOR TO CONDUCT SOIL TEST AND PROVIDE RESULTS ALONG WITH RECOMMENDED FERTILIZER
<br />FORMULA TO OWNER FOR REVIEW AND APPROVAL PRIOR TO APPLICATION.
<br />7. INSTALLATION OF SEED AND SOD SHALL OCCUR WITHIN ONE (1) WEEK OF COMPLETING THE GRADING.
<br />8. CONTRACTOR SHALL BE RESPONSIBLE FOR WATER DURING THE PLANTING ESTABLISHMENT PERIOD.
<br />9. TOPSOIL SHALL BE SALVAGED. 6" OF TOP SOIL SHALL BE PLACED IN ALL SEEDED AREAS. SEE LANDSCAPE
<br />NOTES FOR PLANTING AREAS. LANDSCAPE CONTRACTOR TO COORDINATE WITH THE GENERAL
<br />CONTRACTOR AND EARTHWORK SUB -CONTRACTOR TO VERIFY TOPSOIL CONDITION. ENSURE TOPSOIL
<br />CONFORMS TO ASTM D 5268, WITH A PH RANGE OF 5.5 TO 7.2, A MINIMUM OF 10 PERCENT ORGANIC
<br />MATERIAL CONTENT AND LESS THAN 30% CLAY; FREE OF STONE 1 INCH OR LARGER IN ANY DIMENSION
<br />AND OTHER EXTRANEOUS MATERIAL HARMFUL TO PLANT GROWTH. CERTIFY THAT SOIL USED IS WITHIN
<br />ALLOWABLE TOLERANCES FOR SAFE PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND PULVERIZED
<br />BY A HARLEY RAKE OR EQUAL PRIOR TO PLANT INSTALLATION. IF IMPORTED SOIL IS NEEDED, IT SHALL BE
<br />TOPSOIL BORROW. GRADING AND EROSION CONTROL PER CIVIL PLANS AND SPECIFICATIONS.
<br />10. SEE LANDSCAPE NOTES FOR SOIL COMPACTION RATES.
<br />THE IRRIGATION SYSTEM CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
<br />1. COORDINATION WITH ALL OTHER TRADES.
<br />2. DETAILED DESIGN OF AN IRRIGATION SYSTEM TO INCLUDE ALL TURF SOD AND PLANT BED AREAS..
<br />DESIGN SHALL INCLUDE PIPE SIZING, HEAD SELECTION, LOCATIONS OF HEADS, ZONING, AND CONTROL
<br />SYSTEMS. DESIGN SHALL PROVIDE NO OVERSPRAY ONTO WALKS. IRRIGATION PLAN, DESIGN DETAILS
<br />AND PRODUCT SHEETS SHALL BE SUBMITTED TO THE ENGINEER AND OWNER FOR REVIEW AND
<br />APPROVAL PRIOR TO PURCHASING ANY MATERIALS.
<br />3. LABOR AND MATERIALS NECESSARY TO INSTALL A NEW IRRIGATION SYSTEM. THE IRRIGATION
<br />CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR FURNISHING AND INSTALLING THE IRRIGATION
<br />CONTROL SYSTEM ALONG WITH ANY CONNECTIONS MADE TO THE WATER SERVICE.
<br />4. TESTING OF THE COMPLETE IRRIGATION SYSTEM.
<br />5. STARTUP AND ADJUSTMENT OF THE SYSTEM.
<br />6. PROVIDE OWNER'S EMPLOYEES WITH OPERATIONAL TRAINING ONSITE AND SUBMIT OPERATION AND
<br />MAINTENANCE MANUALS FOR ALL COMPONENTS.
<br />7. AS -BUILT DRAWINGS SHOWING THE LOCATION AND FEATURES OF ALL IRRIGATION COMPONENTS.
<br />8. CONTRACTOR SHALL INCLUDE A RAIN SENSOR AND AN ADDITIONAL FORM OF WATER CONSERVING
<br />TECHNOLOGY, SUCH AS A WEATHER COMPENSATING SMART CONTROLLER TO THE IRRIGATION SYSTEM.
<br />CODES AND INSPECTION
<br />1. THE ENTIRE INSTALLATION SHALL FULLY COMPLY WITH ALL LOCAL AND STATE LAWS AND ORDINANCES
<br />AND WITH THE ESTABLISHED CODES ALLOCABLE THERETO.
<br />2. THE CONTRACTOR SHALL TAKE OUT ALL REQUIRED PERMITS, ARRANGE FOR ALL NECESSARY
<br />INSPECTION, AND PAY ANY FEES AND EXPENSES IN CONJUNCTION WITH THE SAME AS PART OF THE
<br />WORK UNDER THIS CONTRACT.
<br />QUALITY ASSURANCE
<br />1 ALL WORK AND MATERIALS TO BE IN FULL ACCORDANCE WITH LATEST RULES AND REGULATIONS OF THE
<br />DIVISION OF INDUSTRIAL SAFETY, THE UNIFORM PLUMBING CODE, NATIONAL ELECTRIC CODE, AMERICANS
<br />WITH DISABILITIES, AND OTHER APPLICABLE LAWS OR REGULATION.
<br />2. NOTHING IN THESE DRAWINGS OR SPECIFICATIONS IS TO BE CONSTRUED TO PERMIT WORK NOT
<br />CONFORMING TO THESE CODES.
<br />3. FURNISH, WITHOUT EXTRA CHARGE, ANY ADDITIONAL MATERIAL AND LABOR AS REQUIRED TO COMPLY
<br />WITH THESE RULES AND REGULATIONS, THOUGH THE WORK IS NOT MENTIONED IN THESE PARTICULAR
<br />CONSTRUCTION DOCUMENTS.
<br />LANDSCAPE NOTES
<br />1. TREES AND SHRUBS SHALL BE PROVIDED IN THE QUANTITY, SIZE, GENUS, SPECIES, AND VARIETY AS
<br />CHOSEN BY THE OWNER/OWNER AS LISTED ON THE PLANT SCHEDULE.
<br />2. TREES AND SHRUBS SHALL BE HEALTHY, VIGOROUS STOCK, GROWN IN RECOGNIZED NURSERY IN
<br />ACCORDANCE WITH GOOD HORTICULTURAL PRACTICE AND FREE OF DISEASE, INSECTS, EGGS, LARVAE,
<br />AND DEFECTS.
<br />3. OWNER RETAINS THE RIGHT TO INSPECT TREES AND SHRUBS FOR SIZE AND CONDITION OF BALLS AND
<br />ROOT SYSTEMS, INSECTS, INJURIES, AND LATENT DEFECTS, AND TO REJECT UNSATISFACTORY OR
<br />DEFECTIVE MATERIAL AT ANY TIME DURING PROGRESS OF WORK.
<br />4. NURSERY STOCK SHALL BE DELIVERED DIRECTLY FROM NURSERY. HEEL IN IMMEDIATELY UPON
<br />DELIVERY IF NOT TO BE PLANTED WITHIN FOUR HOURS, COVERING WITH MOIST SOIL OR MULCH TO
<br />PROTECT FROM DRYING. STORE PLANTS IN SHADE AND PROTECT FROM WEATHER.
<br />5. PROTECTION FROM EXTREMES IN EXPOSURE AND ROUGH HANDLING SHALL BE PROVIDED FOR ALL
<br />PLANT MATERIALS DURING TRANSPORT AND STORAGE.
<br />6. THE CONTRACTOR SHALL NOTIFY THE OWNER 48 HOURS PRIOR TO PLANTING SO THAT A MUTUALLY
<br />AGREEABLE TIME MAY BE ARRANGED FOR INSPECTION.
<br />7. LAY OUT INDIVIDUAL TREE AND SHRUB LOCATIONS WITH STAKES CENTERED AT PROPOSED PLANTING
<br />LOCATIONS FOR APPROVAL BY OWNER.
<br />8. DO NOT START PLANTING WORK UNTIL LAYOUT IS APPROVED BY THE OWNER.
<br />9. TO ENSURE PROPER INFILTRATION THE LANDSCAPE CONTRACTOR MUST PROVE THE OPEN SUB -GRADE
<br />OF ALL PLANTING AREAS AFTER THEIR EXCAVATION IS COMPACTED LESS THAN 200 PSI. THE OWNER OR
<br />OWNER'S REPRESENTATIVE MUST BE ONSITE DURING COMPACTION TESTING.
<br />10. ALL GRADED AREAS OF THE SITE THAT ARE DESIGNATED FOR SHRUBS, TREES AND PERENNIALS SHALL
<br />HAVE NO LESS THAN 12" OF SALVAGED TOPSOIL. IF ADDITIONAL TOPSOIL NEEDS TO BE IMPORTED IT
<br />SHALL BE TOPSOIL BORROW.
<br />11. STORM BASIN BOTTOM AND SIDE SLOPE SOILS PER CIVIL PLANS.
<br />7. TOPSOIL SHALL BE SALVAGED. LANDSCAPE CONTRACTOR TO COORDINATE WITH THE GENERAL
<br />CONTRACTOR AND EARTHWORK SUB -CONTRACTOR TO VERIFY TOPSOIL CONDITION.
<br />ESTABLISHMENT (SPRING SEEDING):
<br />1. PREPARE SITE - LATE APRIL - MAY.
<br />2. SEED - MAY 1 - JUNE 1
<br />MAINTENANCE:
<br />1. MOW (TO 6-8 INCHES) - EVERY 30 DAYS AFTER PLANTING UNTIL SEPTEMBER 30.
<br />2. WEED CONTROL - MOWING SHOULD HELP CONTROL ANNUAL WEEDS. SPOT SPRAY THISTLES ETC.
<br />ESTABLISHMENT (FALL SEEDING):
<br />1. PREPARE SITE - LATE AUGUST - EARLY SEPTEMBER.
<br />2. SEED - LATE SEPTEMBER TO FREEZE-UP.
<br />MAINTENANCE (FOLLOWING SEASON):
<br />1. MOW (TO 6-8") - ONCE IN MAY, JUNE AND JULY.
<br />2. WEED CONTROL - MOWING SHOULD KEEP ANNUAL WEEDS DOWN. SPOT SPRAY THISTLES ETC.
<br />EVALUATION:
<br />1. COVER CROP GROWING WITHIN 2 WEEKS OF PLANTING (EXCEPT DORMANT PLANTINGS).
<br />2. SEEDLINGS SPACED 1-6 INCHES APART IN DRILL ROWS.
<br />3. GENERAL GRASS AND FORB SEEDLINGS MAY ONLY BE 4-6 INCHES TALL.
<br />4. IF THERE IS A FLUSH OF GROWTH FROM FOXTAIL ETC., MOW AS NECESSARY TO KEEP LIGHT TO
<br />GROUND FOR GENERAL SEEDLINGS.
<br />YEAR 2 - MAINTENANCE:
<br />1. MOW (TO 6-8 INCHES) ONE TIME BETWEEN JUNE 1 - AUGUST 15 BEFORE WEEDS SET SEED.
<br />2. WEED CONTROL - SPOT MOWING SHOULD KEEP ANNUAL WEEDS DOWN. SPOT SPRAY THISTLES ETC.
<br />3. SOME SITES MAY NOT REQUIRE MUCH MAINTENANCE THE SECOND YEAR.
<br />EVALUATION:
<br />1. COVER CROP WILL BE GONE UNLESS WINTER WHEAT WAS USED IN A FALL PLANTING.
<br />2. GRASSES FORMING CLUMPS 1-6 INCHES APART IN DRILL ROWS, BUT STILL SHORT. AT LEAST 1 SEEDED
<br />GENERAL PLANT ESTABLISHED PER SQUARE FOOT.
<br />3. SOME FLOWERS SHOULD BE BLOOMING (BLACK EYED SUSANS, BERGAMOT ETC.).
<br />4. IF THERE IS A FLUSH OF GROWTH FROM FOXTAIL ETC., MOW SITE.
<br />YEAR 3 - MAINTENANCE:
<br />1. MOW ONLY IF NECESSARY FOR WEED CONTROL.
<br />2. WEED CONTROL - SPOT SPRAY THISTLES, ETC.
<br />3. SITES USUALLY DO NOT REQUIRE MUCH MAINTENANCE THE THIRD YEAR.
<br />EVALUATION:
<br />1. PLANTING SHOULD BEGIN LOOKING LIKE A PRAIRIE - TALL GRASSES, FLOWERS ETC.
<br />LONG-TERM -MAINTENANCE:
<br />1. WEED CONTROL - SPOT SPRAY THISTLES, WEED TREE SEEDLINGS, ETC.
<br />2. DORMANT MOW (3-4 YEAR ROTATION) LATE SPRING.
<br />*i.��i����jI , \j\/\;/ ,
<br />--1//\�j
<br />-IIII/ �
<br />t\==I= / 1=-III =
<br />1 11i_=
<br />•
<br />1o�
<br />-II I I111-1 I I
<br />I I I I I I I I I I -WHIP
<br />WHI
<br />_
<br />11111-111-111-111-111-111- 111 1 1
<br />1_I � I1 � 1-111-111--1 1 1 `
<br />II-IIII I i=1 I=1 111111I I I, 11-� I'
<br />2X ROOT BALL DIA. MIN
<br />s �
<br />DECIDUOUS TREE PLANTING
<br />NOT TO SCALE
<br />SPECIES AS SHOW ON PLAN
<br />PRUNE ANY DAMAGED OR BROKEN
<br />BRANCHES. DO NOT CUT LEADER.
<br />ROOT FLARE MUST BE ABOVE FINISHED GRADE.
<br />DO NOT COVER ROOT FLARE WITH MULCH
<br />DOUBLE SHRED, HARD WOOD MULCH (3") MIN.
<br />ROUGH THE SIDES OF THE HOLE SO
<br />THEY ARE NOT GLAZED FROM DIGGING.
<br />LOOSEN SIDES OF ROOT BALL AND PRUNE
<br />DAMAGED, DESICCATED, OR GIRDLING ROOTS.
<br />BACKFILL AROUND THE ROOT BALL WITH
<br />LOOSE TOPSOIL. WORK SOIL TO SETTLE AND
<br />ELIMINATE VOIDS AND AIR POCKETS. WATER
<br />THOROUGHLY WHEN BACKFILLED 2/3 FULL AND
<br />ALLOW TO SETTLE.
<br />SET ROOT BALL ON SOIL BACKFILL SO THAT
<br />TOP OF ROOT BALL IS ABOVE FINISHED GRADE.
<br />1-
<br />z
<br />w
<br />J
<br />U
<br />0
<br />w
<br />DESCRIPTION:
<br />w
<br />Q
<br />Stantec
<br />733 MARQUETTE AVENUE
<br />SUITE 1000
<br />MINNEAPOLIS, MN 55402
<br />WWW.STANTEC.COM
<br />1
<br />w
<br />0
<br />0
<br />SITE PLAN REVIEW SUBMITTAL
<br />CITY COMMENT REVISIONS
<br />CO CO
<br />0 0
<br />N N
<br />CO 6)
<br />c,, V
<br />0 0
<br />CERTIFICATION:
<br />RAMSEY, ANOKA COUNTY, MN 55303
<br />I HEREBY CERTIFY THAT THIS PLA[J,
<br />SPECIFICATION, OR REPORT W
<br />PREPARED BY ME OR UNDER4
<br />DIRECT SUPERVISION AN I AO AM A
<br />DULY LICENSED LANDS
<br />ARCHITECT UNDER TS OF THE
<br />STATE OF MINNES
<br />MARKS.
<br />LIC£NSF NO.:
<br />56541
<br />DATE: 03/13/2026
<br />PROJECT NO.:
<br />DWN BY: CHK'D BY: APP'D BY:
<br />MSF JDR MSF
<br />ISSUE DATE: 04/09/2026
<br />ISSUE NO.:
<br />SHEET TITLE:
<br />LANDSCAPE DETAILS
<br />SHEET NO.:
<br />L-801
<br />
|