Laserfiche WebLink
04/08/2026 01:38 PM <br />Lots 8-10 will require either an Elevation Certificate or an As -Built Survey to verify that the <br />structures, septic systems, and wells are outside the floodway and that the lowest floor is at or <br />above the regulatory flood protection elevation. This requirement will be outlined in the <br />Development Agreement. <br />0 Replies <br />7 - Lots 8-10 House Locations <br />Created by: Chris Anderson <br />On: 04/07/2026 02:42 PM <br />The house locations of Lots 8-10 will essentially have to be 'locked in' to these locations since the <br />Scenic River Protection Overlay District requires a lot width of 300 feet at the building line. This <br />will be specified in the Development Agreement. <br />8 - Septic Location <br />0 Replies <br />Created by: Chris Anderson <br />On: 04/08/2026 10:10 AM <br />The primary septic location not only doesn't appear to meet the minimum setback (10 feet) but it <br />also appears to encroach onto Lot 9. <br />0 Replies <br />9 - Existing Accessory Buildings <br />Created by: Chris Anderson <br />On: 04/08/2026 10:12 AM <br />These 2 accessory buildings will need to be removed. A Demo Permit from our Building Division <br />is required prior to removing them. <br />0 Replies <br />10 - Road Easement (Doc. #699867.0) <br />Created by: Chris Anderson <br />On: 04/08/2026 11:03 AM <br />Prior to recording the plat, the road easement will need to be vacated. This can be done <br />concurrently with a future step in the platting process. Just want to bring this to your attention <br />now, as a surveyor will need to draft the legal description of the easement being vacated. <br />0 Replies <br />Page 2 <br />