My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 05/11/2026
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2026
>
Agenda - Environmental Policy Board - 05/11/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2026 10:14:04 AM
Creation date
5/7/2026 9:16:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
05/11/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(5) <br />All open trenching is prohibited. Utility installation within the dripline of protected <br />trees, during construction or thereafter, can only occur using trenchless methods. <br />(6) The mowing, clearing, and grubbing of brush located within or under the dripline of <br />protected trees may be allowed, provided such mowing, clearing, or grubbing is <br />accomplished by hand or by mowers. The use of heavy equipment for this purpose <br />shall not be allowed. <br />Removal threshold. <br />(1) Within residential developments, no more than 60 percent of the inches of existing <br />significant tree DBH shall be removed. <br />(2) Within business and employment developments, no more than 70 percent of the inches <br />of existing significant tree DBH shall be removed. <br />Significant trees removed for water quality treatment ponds, public trails and <br />sidewalks, and arterial and collector streets as defined herein, or significant trees that <br />are considered invasive species, are infested with Emerald Ash Borer, or infected with <br />Oak Wilt or Dutch Elm Disease, are considered exempt from the removal threshold <br />calculation. <br />(3) <br />Reforestation/restitution requirement. If a development exceeds the removal threshold <br />specified in subsection (e) above, the developer shall either reforest areas within the site, <br />pay restitution, or some combination thereof. For every one significant tree inch that is <br />removed in excess of the removal threshold, the developer shall replant 1.25 inches (caliper) <br />of new trees or provide the city with $125.00 in restitution. <br />Reforestation/restitution plan. <br />(1) If the total number of significant tree inches to be removed exceeds the removal <br />threshold, the developer shall provide a reforestation plan, or a calculation of <br />restitution, or a combination thereof. <br />(2) A reforestation plan shall be prepared by a registered landscape architect or forester <br />and shall comply with the following criteria: <br />a. The plan shall indicate the location and diameter (or height if coniferous; for each <br />three feet in height is equivalent to one caliper inch) of all reforestation trees to be <br />planted. This can be included on the landscape plan, but the reforestation <br />calculation, trees, and inches, must be specified. <br />b. Size at the time of planting shall comply with the planting standards outlined in <br />the applicable landscape standards for the respective zoning district. <br />c. No more than 25 percent of the reforestation trees shall be from any one species. <br />d. Replacement trees in the reforestation plan may count toward the trees required by <br />the city's landscaping regulations. <br />e. Restitution, if applicable, shall be paid in cash to the city prior to the release of the <br />final plat mylars for recording, or, if a plat was not required, prior to the issuance <br />of a building permit subject to site plan review. Any restitution paid shall be <br />Ordinance #26-09 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.