Laserfiche WebLink
<br />Public Works Department <br />1. Budgetfor the purchase of hand held 800MHz radios to enhance <br />communications with public safety during large storm events and disasters. <br />2. Research education opportunities for specialized training. (ongoing) <br />3. Implement 2007 CIP (Capital Improvements Plan) <br />4. Continue facility planning and space needs analysis for 10 years including <br />2007 funding, also begin process of PCA property acquisition for future <br />Public Works Campus. <br />5. Implement the call-back system for operations. <br /> <br />Engineering Work Plan <br />1. Revise and update all water distribution, storm water system, and sanitary <br />sewer utility mapping.(On-going) <br />2. Update/revise 7 yr street maintenance schedule, looking at funding options <br />for future "high dollar" maintenance years. (On-going) <br />3. Monitor change of ownership in Ramsey Town Center <br />4. Develop priority map identifying potential problems in case of lift station <br />failure. (2 of 6 complete.(completion in 2007) <br />5. Continue to develop plan review checklist. <br />6. Prioritize neighborhood connections for future CIP <br />7. Research feasibility of regional utilities (water treatment, waste water) <br />8. Complete storm water management plan for year 2007. <br />9. Explore interconnect ability for increased regional benefit for surface water <br />treatment facility <br />10. Implement plan for communicating better with residents during the planning <br />for the street maintenance program <br />11. In preparation for the Comprehensive plan update, complete the update of the <br />Surface Water Management Plan <br /> <br />Streets Work Plan <br />1. . Continue storm water inspection system and prioritize corrections as <br />necessary. <br />2. Continue street maintenance performance evaluation program for seal coating <br />and overlay projects utilizing the street rating program with engr and PW <br />staff. ~ . <br />3. Final upgrades to metal building (floor drains) <br />4. Formalize policy for private streets/walk/trail clearing. <br />5. Prioritize/document walk and trail maintenance service including hydrant <br />clearing. . <br />6. Continue educating residents on plowing process and staking policy. (On- <br />. going) <br />7. Continue OSHAlMNDOT training in equipment operation. (On-going) <br /> <br />Utilities Work Plan <br />1. Continue efforts to assure accurate water billing. <br /> <br />2007 Objectives & Work Plan <br />-6- <br />