My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 02/13/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:59:47 AM
Creation date
2/9/2007 3:07:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
district will be master planned and is intended to contain larger - scale, more auto oriented <br />commercial uses than are intended for the Town Center on the east side of Armstrong Boulevard. <br />To accomplish this, the B -3 District was drafted to allow a significant amount of design <br />flexibility through the master planning process, rather than assuming lot -by -lot development with <br />specific setbacks and lot standards (as is the case in the B -1 and B -2 zoning districts). The <br />district contains performance standards to guide the creation of the Master Plan. Mr. Trudgeon <br />explained the B =3 District follows the review process outlined in the Planned Unit Development <br />(PUD) District. Once the City has approved a Master Plan that meets the performance standards <br />in the B -3 District, any significant changes to the Master Plan require the developer to process a <br />revised preliminary site plan for the entire site. A final site plan would be processed for each <br />phase of the project as they -are constructed, ensuring compliance with the Master Plan. <br />Community Development Director Trudgeon advised the changes staff is proposing would <br />clarify that proposed developments would need to follow the entire PUD review process, <br />including a preliminary and final site plan. Staff is also recommending a change to Subd. 6 b -3: <br />Building Orientation, to explicitly allow more than one building per lot. This type of <br />development was anticipated when the B -3 District was originally drafted, but staff feels it is <br />important to state this explicitly within the B -3 District to avoid conflicts with other sections of <br />City Code. Staff would also note that no parcels have been rezoned to B -3 Business to date; this <br />action is expected to coincide with preliminary plat review of Ramsey Crossings. Mr. Trudgeon <br />advised the Planning, Commission and staff are recommending adoption of the proposed <br />changes. <br />Motion by Councilmember Elvig, seconded by Councilmember Strommen, to introduce an • <br />ordinance amending Section 9.20.28 (B -3 Business District) of Chapter 9 of City Code. <br />Motion carried. Voting Yes: Mayor Gamec, Councilmembers Elvig, Strommen, Dehen, Jeffrey, <br />Look, and Olson. Voting No: None. <br />Case 99: Resolution to Adopt Anoka County Multi- Jurisdictional Hazard Mitigation <br />Plan <br />Fire Chief Kapler stated Federal Emergency Management Agency (FEMA), under the Disaster <br />Mitigation Act of 2000, has ordained that every county and incorporated municipality within the <br />county is required to participate and complete a Hazard Mitigation Plan. Over the past two <br />years, each community within Anoka County has been involved in creating a Multi - <br />Jurisdictional Hazard Mitigation Plan. The plan was sent to FEMA for review and was approved <br />in its first draft in late 2006. The plan details the history of disasters experienced in each <br />community within Anoka County, along with an extensive evaluation of both natural and man- <br />made disaster possibilities in the future. This evaluation includes an estimate of probability of <br />such event, along with a severity rating of impact to the community. Chief Kapler stated <br />extensive staff time was taken to prepare Ramsey's portion of the plan. Those staff costs were <br />incurred by the respective departments of Police, Fire and Public Works. The cost of gathering <br />all the communities input and creating the final document was absorbed by the Emergency <br />Management staff of Anoka County. Chief Kapler noted if Ramsey were to experience another, • <br />City Council / January 23, 2007 <br />Page 22 of 28 <br />—228— <br />
The URL can be used to link to this page
Your browser does not support the video tag.