Laserfiche WebLink
(RJRyan <br />nstruction, Inc. <br />Wildlife Research Additional Land Costs <br />!Item No. Description Estimated Cost Comments <br />Import an additional 10,000 CY of off -site materials to get site up <br />1 to a pad ready condition $ 200,000 <br />Includes retaining wall on the east side of the site as well <br />2 Construct retaining walls on the east side of the side $ 111,180 and 4' tall black vinyl chain link fencing on the top. <br />MH-1, MH-2, MH-3 structures and piping to MH-4, storm water <br />3 being taken on from other sites into ours $ 49,500 <br />Demo and dispose of roughly 100 LF of eixsting storm piping and a <br />4 flared end section $ 5,000 <br />Additional storm piping along the north property line and expand <br />5 the regional pond $ 274,450 <br />4/17/2026 <br />