Laserfiche WebLink
K' <br />horift K2401 AARA- Anoka Ramsey Athletic Association <br />11111g- CONSTRUCTION <br />Project Estimate <br />Date: January 9, 2026 <br />Estimate: Preliminary Budget <br />Divisions <br />Sum of Budget <br />Amount <br />Notes <br />01 - General Conditions <br />03 - Concrete <br />105 - Metals <br />06 - Wood, Plastic & Composites <br />07 -Thermal & Moisture Protection <br />90 - Doors, Frames & Hardware <br />09 - Finishes <br />119 - Specialties <br />11 - Equipment <br />112 - Furnishings <br />113 - Special Construction <br />21 - Fires Suppression <br />22 - Plumbing <br />123 - (HVAC) <br />I79 - Electrical <br />27 - Communications <br />128 - Electronic Safety & Security <br />131 - Earthwork <br />32 - Exterior Improvement <br />33 - Utilities <br />134 - Utility Fees <br />la - lieggl Fee; <br />39 - Building Permit & Plan Review <br />4 - Isurgnce <br />50 - Contingency <br />51 - Profit & Overhead <br />Total Construction' $ <br />361,838.00 Project mgmt., Site supervision, Temp toilets, Dumpsters, Special Inspections, <br />Testing, SWPPP Reporting, Temp const & Enclosures, Etc. <br />1,134,000.00 Cast in place, Footings, frost walls , SOG, Stoops <br />4,817,375.00 Mezzanine, PEMB, Misch Metals <br />44,000.00 Rough Carpentry, Wood framing, Lumber package, Millwork <br />268,000.00 PEMB Insulation, Caulking <br />32M94.Q9 H.M. Frames , p9ors, glq;s GI )ng,➢oor 9perpk9r;, Mirrors. <br />232,173.00 Drywall, Floor finishes, Painting Tiling, Acoustical Ceilings, Carpet. <br />39,33599 T9ilet /8kcceswries, Tp)Iet Partitions, Fire extinguishers and cabs, Interior Signage <br />170,000.00 Athletic Equipment Allowance <br />By ARAA <br />535,000.00 Athletic Flooring Allowance <br />194,461.00 Fire Sprinkler System. <br />127,390.00 Plumbing <br />518,000.00 HVAC System <br />295,000.00 iEhctrical, Lightir)g,,VAC Wiring <br />25,000.00 Allowance- By ARAA <br />9,120.00 Fire Alarm if Occ. Is under 1000 - See Alt for over 1000 <br />410,736.00 Earthwork & Underground Utilities, Staking & Survey included. <br />761,672.00 Asphalt Paving, Class 5 Base, Curb & Gutter, Landscaping & Irrigation. <br />479,399.00 Sewer & Water Private Utilities <br />30,000.00 Electrical / Gas Service Allowance <br />233,704.00 <br />776,337.43 <br />385,673.34 <br />12,252,545.43 <br />Includes SAC/WAC 30 unit estimate <br />Includes Builders Risk\Policy <br />Unused amount goes back to owner <br />KCI O&P <br />Alternates <br />Alt Notes <br />yver 1990 Occupants: <br />$ 3901.99 <br />Firer Al rCn upgrade if over 1009pcc4ants <br />Force Main: <br />$ 161,076.00 <br />$64,4302 Total Cost shared with developer <br />$ 12,501.00 <br />$50,003 Total Cost shared with developer <br />IDewatering: <br />Total Alternate Costs <br />$ 203,238.00 <br />& Engineering <br />(Design <br />Architectural & Structural <br />$ 40,000.00 <br />Civil <br />$ 45,000.00 <br />Geotechnical <br />$ 13,000.00 <br />Total Design & Engineering <br />$ 98,000.00 <br />(Ramsey Development Fees <br />Park Dedication <br />(Trail Fee <br />IWaterTrunk <br />If Water Lateral <br />'Sewer Trunk <br />(Sewer Lateral <br />Storm Water Mgmt. <br />'Landscape Guarantee <br />Inspection Fee <br />Total Development Fees <br />19,440.00 <br />5,040.00 <br />$ 78,620.00 <br />37099.00 <br />$ 43,510.00 <br />$ 2,312.00 <br />$ 56,980.00 <br />10,000.00 <br />$ 76,825.00 <br />$54,000 Total - PSD Platting Cost for 10 Acre Site - 64% PSD 36% ARAA <br />$14,000 Total - PSD Platting Cost for 10 Acre Site - 64% PSD 36% ARAA <br />Estimate: Too early to calculate <br />$ 295,826.00 <br />Total Project Budget <br />$ 12,849,609.43 <br />Financial Surety <br />'Letter of Credit <br />$ 1,920,631.00 UCost of Letter of Credit estimated to be 5% or $96,031 <br />