My WebLink
|
Help
|
About
|
Sign Out
Home
12/12/06
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Minutes
>
2000's
>
2006
>
12/12/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2025 3:31:20 PM
Creation date
2/14/2007 12:09:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Finance Committee
Document Date
12/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Finance Officer Lund advised the building permit data processing system and the laser fiche <br />system are likely equal to the $28,000 suggested in cuts for line item 6405. <br /> <br />Chairperson Strommen requested input from staff on whether there is room for additional cuts in <br />the proposed budget given the concerns the Finance Committee has stated, or whether the current <br />proposed budget is what is needed to function. <br /> <br />Finance Officer Lund explained the majority of the expense is included in the consultant line <br />item. This line item is based on how much the Council is willing to spend on consultants for the <br />different projects. <br /> <br />Councilmember Elvig stated it is difficult to say what the Council is willing to authorize without <br />knowing how the line item was compiled. In general, there was a lot of consultant work done in <br />2005, and it does not seem there is much coming forward in 2007 in comparison. He noted there <br />will not be a City Administrator on staff and the City will be down one staff person, which may <br />require backfilling with consultants to overcome some of that shortage. However, even with that <br />in mind he is comfortable with the 2007 projects compared to 2005. <br /> <br />Public Works Director Olson stated the City went to Washington D.C. two years in a row to <br />lobby for Highway 10 improvements. Consultants were significant in that effort of finding <br />additional money for the corridor improvement. The amount of funding allocated to consultants <br />is dependent on what the Council would like done. He advised the Engineering Department has <br />added $25,000 for the match that will be required for Highway 10 interchanges. <br /> <br />Community Development Director Trudgeon stated the Community Development Department <br />typically budgets approximately $20,000 in professional services. This year $50,000 was <br />budgeted specifically for the Comprehensive Plan, although the cost will likely be close to <br />$80,000. A CDBG grant has been obtained to fill some of the gap, with approximately 2/3 of the <br />cost coming from the budget. The Comprehensive Plan is mandated every ten years, so it is a <br />significant hit to take in the budget in one year. If staff has to get leaner they can look at ways to <br />do that, such as what can be done in-house; the City now has GIS capability, which they did not <br />have previously. Also, the Comprehensive Planning process will likely extend into 2008 and, if <br />necessary, some of the costs can be backfilled in the 2008 budget. RFP's will be brought before <br />the Council at the December 28 Council meeting, and in February there will be a better estimate <br />of the costs. The McKinley Grant will lay a lot of foundation and groundwork to hopefully <br />minimize costs; the Comprehensive Plan update has been started with a lot of wetland and <br />natural resource information gathered that will come out of the Landfill Tipping Fund. Staff can <br />make the budget work, but 2007 is an unusual year for Community Development, and the dollars <br />are more needed than in the past. <br /> <br />City Administrator Norman stated staff will take direction from the Council. However, to <br />seriously look at additional cuts to the budget in the amount being discussed, staff needs time to <br />review the budget further, which will require a special meeting to be scheduled. He suggested <br />the full Council weigh in on the discussion of whether to direct staff to review and recommend <br />additional significant cuts to the proposed budget. <br /> <br />Finance Committee I December 12, 2006 <br />Page 3 of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.