My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/28/2026
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2026
>
Agenda - Planning Commission - 05/28/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 9:29:18 AM
Creation date
5/21/2026 3:01:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRE -FINISHED METAL <br />SIDING PANEL, COLOR 2 <br />NORTH ELEVATION <br />SCALE: 1" = 20'-0" <br />11111111111111 <br />11 11111111111111111 111111111111111111111 III <br />11 11111111111111111 111111111111111111111 1111 <br />1 <br />PRE -FINISHED METAL <br />SIDING PANEL, COLOR 1 <br />00 00 I LIPP [ 00 00 I LIP I <br />1 <br />EAST ELEVATION <br />SCALE: 1" = 20'-0" <br />SOUTH ELEVATION <br />SCALE: 1" = 20'-0" <br />PRE -FINISHED METAL <br />SIDING PANEL, COLOR 2 <br />• <br />WOOD -LOOK PRE -FINISHED METAL <br />FINS (ALT: PAINTED METAL) <br />l <br />L <br />WOOD -LOOK PRE -FINISHED METAL <br />FINS (ALT: PAINTED METAL) <br />11— <br />. I, PRE -FINISHED <br />I I I I • METAL FASCIA <br />I I I I I <br />. I I I I I• <br />. I I I I I• <br />. I I I I I• <br />. I I I I I• <br />PRE -FINISHED <br />METAL ROOF AT <br />CANOPY BEYOND <br />PRE -FINISHED <br />METAL SOFFIT <br />PAINTED <br />STEEL <br />COLUMN <br />IIIIIrnf"IIIIII111IIIII11II° l'SPOR SPLE%SEY <br />1 <br />POURED CONCRETE <br />COLUMN BASE <br />i3 WEST ELEVATION <br />�A3 SCALE: 1" = 20'-0" <br />■ <br />� in <br />PRE -FINISHED METAL <br />TO MATCH FASCIA <br />I-- III III I III I <br />WOOD -LOOK PRE -FINISHED <br />SIDING PANEL <br />fog <br />data 11 <br />PRE -FINISHED METAL ROOF <br />TOP OF FRAME <br />EL. 149'-8 3/4" I <br />PRE -FINISHED METAL <br />SIDING PANEL, COLOR 1 <br />PRE -FINISHED METAL <br />FASCIA AT CANOPY <br />ANODIZED ALUMINUM <br />FRAMES <br />FINISHED FLOOR <br />EL. 100'-0" 11P- <br />PRE-FINISHED METAL <br />SIDING PANEL, COLOR 1 <br />TOP OF FRAME <br />EL. 143'-5 3/4" IK <br />PRE -FINISHED METAL <br />SIDING PANEL, COLOR 1 <br />FINISHED FLOOR <br />EL. 100'-0" <br />LAMPERT <br />ARCHITECTS <br />420 Summit Avenue �. <br />St. Paul, MN 55102 <br />Phone:763.755.1211 Fax:763.757.2849 <br />lampert®lampert—arch.com <br />ARCHITECT CERTIFICATION: <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM DULY <br />LICENSED ARCHITECT UN E <br />LAWS OF THE 5;� E OTA. <br />pR <br />SI ATURE <br />LE* T <br />PRINT <br />13669 <br />LICE <br />CT: <br />° <br />ANOKA RAMSEY <br />ASSOCIATION <br />ATHLETIC <br />Ramsey, Minnesota <br />Copyright 2024 <br />Leonard Lampert Architects Inc. <br />Project Designer: L. SCHMIDT <br />Drawn By: LLS <br />Checked By: LL <br />Revisions <br />5/24/24 PRELIMINARY <br />BUILDING ELEVATIONS <br />Sheet Number <br />Project No. 240229-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.