Laserfiche WebLink
W <br />ho0111 K2401 AARA- Anoka Ramsey Athletic Association <br />Project Estimate <br />CONSTRUCTION <br />Date: January 9, 2026 <br />Estimate: Preliminary Budget <br />Divisions <br />Sum of Budget <br />Amount <br />Notes <br />01 - General Conditions <br />03 - Concrete <br />105 - Metals <br />106 - Wood, Plastic & Composites <br />107 - Thermal & Moisture Protection <br />08 - Doors, Frames & Hardware <br />09 - Finishes <br />10 - Specialties <br />11 - Equipment <br />12 - Furnishings <br />13 - Special Construction <br />121- Fires Suppression <br />22 - Plumbing <br />23 - (HVAC) <br />126 - Electrical <br />127 - Communications <br />0 - clecs;ronic Safety & Security <br />31- Earthwork <br />32 - Exterior Improvement <br />33 - Utilities <br />134 - Utility Fees <br />36 - Le al Fees <br />39 - Building Permit & Plan Review <br />149 - Insurance <br />150 - Contingency <br />51- Profit & Overhead <br />Total Construction <br />$ 361,838.00 <br />1,134,000.00 <br />4,817,375.00 <br />44,000.00 <br />268,000.00 <br />326,194.00 <br />232,173.00 <br />39,285.00 <br />170,000.00 <br />535,000.00 <br />194,461.00 <br />127,390.00 <br />518,000.00 <br />295,000.00 <br />25,000.00 <br />9,120.00 <br />410,736.00 <br />761,672.00 <br />479,399.00 <br />30,000.00 <br />233,704.00 <br />78,187.66 <br />776,337.43 <br />385,673.34 <br />$ 12,252,545.43 <br />Project mgmt., Site supervision, Temp toilets, Dumpsters, Special Inspections, <br />Tstipg, SWPpp Reportn, Temp corlA Enclosures, Etc. <br />Cast in place, Footings, frost walls , SOG, Stoops <br />Mezzanine, PEMB, Misch Metals <br />Rough Carpentry, Wood framing, Lumber package, Millwork <br />PEMB Insulation, Caulking <br />H.M. Frames & Doors, Glass & Glazing, Door operators, Mirrors. <br />Drywall, Floor finishes, Painting Tiling, Acoustical Ceilings, Carpet. <br />Toilet Accessories, Toilet Partitions, Fire extinguishers and cabs, Interior Signage <br />Athletic Equipment Allowance <br />BY ARAA <br />Athletic Flooring Allowance <br />Fire Sprinkler System. <br />Plumbing <br />HVAC System <br />Electrical, Lighting, HVAC Wiring <br />Allowance- By ARAA <br />Fir6 fdarm if Occ,)s under 10(N -,See Altjor Qver 1000 <br />Earthwork & Underground Utilities, Staking & Survey included. <br />Asphalt Paving, Class 5 Base, Curb & Gutter, Landscaping & Irrigation. <br />Sewer & Water Private Utilities <br />Electrical / Gas Service Allowance <br />Includes SAC/WAC 30 unit estimate <br />Includes Builders Risk Policy <br />Unused amount goes back to owner <br />KCI O&P <br />Alternates <br />Alt Notes <br />Over 1000 Occupants: <br />$ 29,661.00 <br />Fire Alarm upgrade if over 1000 occupants <br />Force Main: <br />$ 161,076.00 <br />$64,4302 Total Cost shared with developer <br />Dewatering: <br />$ 12,501.00 <br />$50,003 Total Cost shared with developer <br />Total Alternate Costs <br />$ 203,238.00 <br />Design & Engineering <br />Architectural & Structural <br />$ 40,000.00 <br />Civil <br />$ 45,000.00 <br />Geotechnical <br />$ 13,000.00 <br />Total Design & Engineering <br />$ 98,000.00 <br />Ramsey Development Fees <br />Park Dedication <br />Trail Fee <br />Water Trunk <br />Water Lateral <br />'Sewer Trunk <br />(Sewer Lateral <br />Storm Water Mgmt. <br />Landscape Guarantee <br />Inspection Fee <br />Total Development Fees <br />199440.00 <br />5,040.00 <br />78,620.00 <br />3,099.00 <br />43,510.00 <br />2,312.00 <br />56,980.00 <br />10,000.00 <br />76,825.00 <br />$,54,000 Total - PSD P)pttipg Cost fyr 10 Acre Site - 64% PSD 36% ARAA <br />$14,000 Total - PSD Platting Cost for 10 Acre Site - 64% PSD 36% ARAA <br />Estimate: Too early to calculate <br />$ 295,826.00 <br />Total Project Budget <br />$ 12,849,609.43 <br />Financial Surety <br />(Letter of Credit <br />$ 1,920,631.00 ('Cost of Letter of Credit estimated to be 5% or $96,031 <br />