Laserfiche WebLink
wells will have sufficient groundwater volumes for the city's needs now and in the foreseeable future. <br />Other attached reference materials include; <br />• 44-page 2020 Metropolitan Council Report "Water Supply Planning in the Twin Cities Metropolitan Area <br />(2005-2020)" <br />• 4-page summary of the 2020 Metropolitan Council Report "Water Supply Planning in the Twin Cities <br />Metropolitan Area (2005-2020)" <br />Tentative project schedule: <br />• May 26th — City Council authorizes solicitation of Well Siting Study Requests for Proposals. <br />• May 27th — Staff solicits Well Siting Study Requests for Proposals from applicable engineering consultants. <br />• July 21 st — Public Works Committee recommends City Council acceptance of Well Siting Study Proposals <br />and award of contract to the lowest responsible proposer. <br />• July 28th — City Council accepts Well Siting Study Proposals and awards contract to the lowest responsible <br />proposer. <br />• July 29th - December 18th — Well Siting Study completed <br />Funding Source: <br />Copies of the associated 2026 — 2035 Capital Improvement Plan sheets, sheets 295 and 296, are attached for <br />reference. As noted, the CIP level cost estimate for the study is $50,000. <br />All required engineering services will be funded through the water enterprise fund. <br />Recommendation: <br />On May 19, 2026, the Public Works Committee unanimously recommended City Council approval to solicit <br />Requests for Proposals for a Well Siting Study for proposed municipal groundwater wells #9 and #10. <br />Staff recommends approval to solicit Requests for Proposals for a Well Siting Study for wells #9 and #10 to <br />ensure an adequate supply of water will be maintained for municipal water supply system users, both now and <br />into the foreseeable future. <br />Outcome/Action: <br />Motion to adopt Resolution #26-134 authorizing solicitation of Requests for Proposals for a Well Siting Study for <br />proposed municipal groundwater wells #9 and #10. <br />Resolution 26-134 <br />WTP Feasibility Study <br />Anoka Co Geo Atlas Plate 3 <br />Anoka Co Geo Atlas Plate 4 <br />2020 MC Water Supply Report <br />2020 MC WS Report Summary <br />CIP Sheets 295-296 <br />CIP Sheet 297 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 05/21/2026 12: 1 1 PM <br />Form Started By: Bruce Westby Started On: 05/19/2026 08:35 AM <br />Final Approval Date: 05/21/2026 <br />